I have a Windows 2008 R2 active/active failover cluster with 2 resources on node A (lets call them A1 and A2) and 1 resource on node B (lets call it B1). The resources contain services. If node A fails and its 2 resources fail over to node B then resource A2 and B1 will need to be restarted once A1 is running. Is there any way to script this? Basically whenever resouces A1 fails over the other 2 resource need to be restarted.
Thanks in advance.

































