Old cabling methods for raised access floors (2 of 6)

Because access floors are used as pathways for cabling, NEC specifies maximum fill percentage not to exceed 40%. Excess cabling also restricts air flow through the plenum floor, thus creating problems dissipating the excessive heat generated by data center equipment.