Project Management

Hisar School Reduces Hardware Costs by 75% and Accelerates Server Backups by 90%

Free registration required

Executive Summary

Hisar School wanted to consolidate 15 servers to reduce space and power consumption and ease server management while providing a stable, around-the-clock availability learning environment and simplify server setup and configuration for multiple operating systems (such as Linux and Windows) and versions. The challenge was to implement a more efficient way of backing up data while minimizing down time to less than one hour. Hisar School consolidated 15 servers into four physical blades with Oracle's Virtual Iron solution, thus reducing hardware and maintenance costs by 75%.

  • Format: PDF
  • Size: 7.93 KB