Servers

Prepare to Fly: Top Animation Studio Taps HP BladeSystem for a Fourfold Jump in Efficiency

Download Now Free registration required

Executive Summary

Top Animation Studio wanted to maximize data center performance while minimizing the power and space footprint and operating costs. Top Animation Studio replaced another vendor's infrastructure with the HP Adaptive Infrastructure, using low-power models of the HP ProLiant BL2x220c Server for high-density computing. As a result there was significant reduction in server management time vs. previous infrastructure and 500 servers were maintained with one quarter of an administrator's time.

  • Format: PDF
  • Size: 0 KB