Project Management

Wuxi Construction Benefits From an Estimated 50 Percent Reduction in Power Consumption and 60 Percent Reduction in Maintenance Costs With Virtualized Dell Solution

Free registration required

Executive Summary

Wuxi Construction Information Center supports numerous essential systems for the Wuxi Municipal Government. With its existing server infrastructure, the group was experiencing unsustainable power consumption, low server utilization, and high maintenance costs. After a comprehensive selection process, Wuxi Construction Information Center adopted a virtualized solution based on Dell PowerEdge servers and VMware ESXi server software along with Dell/EMC storage.

  • Format: PDF
  • Size: 0.26 KB