Budget Allocation For Permanent And Contingent Capacity Under Stochastic Demand

The authors develop a model of budget allocation for permanent and contingent workforce under stochastic demand. The level of permanent capacity is determined at the beginning of the horizon and is kept constant throughout whereas the number of temporary workers to be hired must be decided in each period. Compared to existing budgeting models, this paper explicitly considers a budget constraint. Under the assumption of a restricted budget, the objective is to minimize capacity shortages. When over-expenditures are allowed, both budget deviations and shortage costs are to be minimized. The capacity shortage cost function is assumed to be either linear or quadratic with the amount of shortage, which corresponds to different market structures or different types of services.

Provided by: Technische Universiteit Eindhoven Topic: Banking Date Added: Apr 2010 Format: PDF