Calculating the Project Network Critical Path in Uncertainty Conditions

Correct scheduling of the project is the necessary condition for the project success. In traditional models, the activities duration times are deterministic and known. In real world however, accurate calculation of time for performing each activity is not possible and is always faced with uncertainty. In this paper, the duration of each activity is estimated by the experts as linguistic variables and the said variables are represented in fuzzy numbers form using the fuzzy theory. Estimating the project accomplishment duration and determining the project critical path will be possible through resolving a fuzzy linear programming model.

Provided by: International Journal of Engineering and Technology Topic: Networking Date Added: May 2010 Format: PDF