Containerised Power and Cooling Modules for Data Centres

Download Now Free registration required

Executive Summary

Standardised, pre-assembled and integrated data centre facility power and cooling modules are at least 60% faster to deploy, and provide a first cost savings of 13% or more compared to traditional data centre power and cooling infrastructure. Facility modules, also referred to in the data centre industry as containerised power and cooling plants, allow data centre designers to shift their thinking from a customised "construction" mentality to a standardised "site integration" mentality.

This white paper compares the cost of both scenarios, presents the advantages and disadvantages of each, and identifies which environments can best leverage the facility module approach.