Servers

Converged Infrastructure solutions help DreamWorks Animation create great films

Free registration required

Executive Summary

In this case study, the DreamWorks studio turns to HP technology to boost rendering throughput while minimizing power consumption and streamlining data center requirements. With HP server blades, networking, storage, and cloud services DreamWorks Animation was able to achieve more than 60% greater rendering throughput and more than 30% higher performance per watt.

Co-Sponsored by: Intel

  • Format: PDF
  • Size: 0.16 KB