Delay Analysis of Scheduling for Multi Hop Wireless Networks

Delay performance of scheduling for multi-hop wireless network in which the routes between source-destination pairs are fixed and new queue grouping technique to handle the multifaceted correlations of the service process resulting from the multi-hop nature of the flows and their mutual allocation of the wireless medium. Wireless system, namely the clique, the authors design a strategy that is model path delay optimal. The lower bound analysis provides useful insights into the design and analysis of best possible or nearly best possible scheduling policies.

Provided by: Creative Commons Topic: Mobility Date Added: Mar 2012 Format: PDF

Find By Topic