HP Converged Infrastructure solutions help DreamWorks Animation create great films and blaze a path toward Instant On Case Study

In this case study, the DreamWorks studio turns to HP technology to deliver more than 60 percent greater throughput and help break new ground faster than ever.

Co-Sponsored by: Intel

Provided by: Hewlett-Packard (HP) Topic: Data Centers Date Added: May 2011 Format: PDF

Find By Topic