Multi Objective Problem in Fuzzy Environment Where Resources Are Triangular Fuzzy Number

In this paper, the solution procedure of multi objective linear programming in fuzzy environment is presented by considering the resources as triangular fuzzy number. In this paper, the tolerances attached to the goals are not chosen subjectively, rather they are measured technically. Then an attempt has been made to solve a common problem by using both the min sum goal programming method and different Fuzzy Goal Programming (FGP) techniques to show the perfection of the FGP technique.

Provided by: EuroJournals Topic: Software Date Added: Oct 2010 Format: PDF

Download Now

Find By Topic