Hardware

Priority Maintainance in Online Scheduler Heterogenous Processor in Real Time System

Free registration required

Executive Summary

The problem related to different components in the scheduler is investigated. A random sample task is analyzed from the set of related task in the queue and a deadline is preset based on the sample task. With this deadline the task in the group is executed assuming that the entire task in the group is similar. An online deadline within a bounded limit is assigned for the control loop of the task i.e. it is represented with the extended deadline to diminish the latency in the task.

  • Format: PDF
  • Size: 303.92 KB