id="info"

Throughput and Delay Analysis for a Differentiated P-Persistent CSMA Protocol With the Capture Effect

With the extensive deployment of 802.11 Wireless Local Area Networks (WLANs) and the need for better Quality of Service (QoS), the 802.11e MAC with service differentiation was developed. Analyzing the effect of fading, shadowing and near-far effect on the performance of 802.11 is a fundamental consideration in practical situations since the wireless channels are error-prone. This paper develops a p-persistent CSMA protocol, which allows for service differentiation by using multiple traffic types, into an accurate and practical model that takes into account the capture effect in a Rayleigh multipath fading environment. A new analytical approach is developed to calculate the throughput and packet delay for multiple traffic types.

Provided by: Institute of Electrical & Electronic Engineers Topic: Mobility Date Added: Apr 2011 Format: PDF

Find By Topic