Transmission Network Expansion with Transmission Loading Relief

Download now Free registration required

Executive Summary

Transmission planning should seek to maintain or improve system security over time and facilitate robust wholesale power markets by improving transmission capacity for bulk power transfers across wide regions It includes finding the optimal plan for the electrical system expansion, it must specify the transmission lines and/or transformers that should be constructed so that the system to operate in an adequate way and in a specified planning horizon. In this paper a methodology is proposed for choosing the best transmission expansion plan using Transmission security based on contingency analysis.