Delay Analysis and Performance Evaluation of a Guaranteed QoS Provisioning Mechanism for Real-Time Traffic in IEEE 802.16e BWA Systems
Source: Institute of Electrical & Electronic Engineers
Now-a-days, multimedia applications are expected to be an important traffic source in wireless networks. Such sources usually have stringent delay requirements and in many cases they should be delivered exactly as they were generated. In this paper, the authors propose a novel polling based uplink packet scheduling policy for rtPS/ertPS (real-time Polling Service/extended real-time Polling Service) traffic to support real-time applications, with strict delay requirements, such as VBR (Variable Bit Rate) traffic in IEEE 802.16e BWA (Broadband Wireless Access) systems. The proposed transmit-permission policy can derive sufficient conditions such that all the rtPS/ertPS sources satisfy their time constraints to provide deterministic QoS (Quality of Service) guarantees.
| Format: | Size: | 459.20 | |
| Date: | Jun 2008 |



