Delay Analysis for Ethernet Long-Reach Passive Optical Networks

Source: Institute of Electrical & Electronic Engineers

Favorite

Free registration required

Designing low latency polling schemes is one of the most important parts for Passive Optical Networks (PONs), particularly for Long-Reach PONs (LR-PON) which suffer from long propagation delays. Sophisticated and efficient bandwidth allocation mechanisms are required to cope with the imposed transmission delay in LR-PONs. In this paper, the authors evaluate three dynamic bandwidth allocation methods in terms of transmission delay. Namely, they consider conventional or interleaved polling for traditional PON and two recently introduced scheduling paradigms for next generation LR-PON, i.e., Multi-Thread Polling (MT-P) and Real-Time Polling (RT-P).
Format:PDF Size:325.59
Date:May 2012