- Subscribe to this page:
- RSS
- Email Alert
methodology
(465 results)-
Webcasts
Use Change Highlighting
Jan 2008
Change highlighting provides a simple visual way for users to see the dates that are changed when users make changes to another task. In this webcast, a task's date and a duration is changed to...
Provided by Microsoft
-
Webcasts
Link Tasks in Your Project
Jan 2008
To identify how the tasks in the project relate to each other in the project schedule, links can be created between them. Links identify task dependencies. In this webcast, finish-to-start and...
Provided by Microsoft
-
Webcasts
Split a Task
Jan 2008
Splitting a task interrupts the scheduled work for the task, creating a gap in the timeline. In this webcast, a task is split, the entire split task is moved, the length of the gap created by the...
Provided by Microsoft
-
Webcasts
Set Up a Recurring Task
Jan 2008
For those who have a task that repeats on a set schedule throughout the project, one can create a recurring task and set a recurrence pattern for that task. In this webcast, a recurring task is...
Provided by Microsoft
-
Webcasts
Create a Visual Report
Jan 2008
Visual reports enable users to view and analyze the project data using PivotDiagrams in Microsoft Office Visio and PivotCharts in Microsoft Office Excel. In this webcast, the Task Status visual...
Provided by Microsoft
-
Webcasts
Create a Cross-Project Link
Jan 2008
If a task in one project has a dependency a cross-project link can be created between the tasks. In this webcast, a cross-project link is created between tasks in two separate Project 2007 files...
Provided by Microsoft
-
Webcasts
Split a View
Jan 2008
There is no need to split hairs in order to split a view. The attendee of this webcast will learn how to split views to efficiently change task and assignment information.
Provided by Microsoft
-
Webcasts
Create a Budget
Jan 2008
Microsoft Office Project 2007 budgets enables users to compare the actual spending with the dollar amounts planned for the project. In this webcast, a budget is created for the project and then...
Provided by Microsoft
-
Webcasts
Insert a Task
Jan 2008
A new task can be inserted between two existing tasks in the project. In this webcast, a new task is inserted and then given it a name and duration.
Provided by Microsoft
-
Webcasts
Create a Custom Field
Jan 2008
For those who need a specific field added to the project that is not included as a default field in Microsoft Office Project 2007, they can create a custom field to meet the needs. In this...
Provided by Microsoft
-
Webcasts
Add Resources
Jan 2008
Adding resources to the project can seem tricky, but it doesn't have to be. The attendee of this webcast will learn how to add resources to the project, and how to assign them to project tasks.
Provided by Microsoft
-
Webcasts
Create a Milestone
Jan 2008
A milestone is a task that represents a reference point, such as the end of a major phase of a project. Typically, milestones have a duration of zero days, but they can have any duration. In this...
Provided by Microsoft
-
Webcasts
Microsoft Office System Webcast: Creating Custom Stakeholder Views in Project 2007 (Level 200)
Nov 2008
Creating project status reports for multiple stakeholders can be challenging since each stakeholder often requires different information in a different format. Microsoft Office Project 2007 has...
Provided by Microsoft
-
Webcasts
TechNet Webcast: Microsoft Office Project Server 2007: Workload Scenarios and Reference Architecture (Level 300)
Nov 2008
This webcast covers Microsoft Office Project Server 2007 workload scenarios and reference architecture to help to plan the deployment. The presenter discusses typical product operations broken out...
Provided by Microsoft
-
White Papers
Why Use the SAP ASAP Methodology?
Jan 2012
In the mid 1990's SAP had gained a significant amount of bad press and publicity around several high profile project disasters that the company knew were completely avoidable. At that time Oracle,...
Provided by R3Now.com
-
Podcasts
Business Intelligence Innovation at Gallup
Mar 2012
Gallup is in the "intelligence" business - their survey's and consulting services deliver relevant, timely, and visionary research on what people around the world think and feel. Ironically one of...
Provided by Oracle
-
Whitepapers
Tape Storage Future Directions and the Data Explosion
Apr 2012
It's time to bring your views of tape up to date as the future for tape technology has never been brighter. Today's tape technologies combined with disk technologies in a strategic blended...
Provided by IBM
-
White Papers
Characterizing User Mobility in Second Life
Aug 2008
In this paper, the authors present a measurement study of user mobility in Second Life. They first discuss different techniques to collect user traces and then focus on results obtained using a...
Provided by Association for Computing Machinery
-
White Papers
Finding the Right Fit: Five Criteria for Evaluating Telecom Management Tools
Feb 2012
It's the start of a new fiscal year. The annual IT budget has been approved, and one have commenced their search for a telecom management software that will help one better navigate the...
Provided by Vcom3D
-
Whitepapers
Six Sigma Methodology Utilization in Telecom Sector for Quality Improvement-A DMAIC Process
Jan 2011
This paper presents tools of Six Sigma for Telecom Industries; these can achieve powerful operational improvements that produce sustainable business benefits. Six Sigma Qualtec's dedicated Six...
Provided by International Journal of Engineering Science and Technology (IJEST)
-
Case Studies
How Cisco IT Designed a Separate Network to Test Cisco Alpha Equipment
Dec 2007
At Cisco, reducing Customer-Found Defects (CFDs) is a top priority and is an initiative mandated by CEO John Chambers. Cisco product engineering methodologies require field trials with live...
Provided by Cisco Systems
-
Whitepapers
Feature Specific Criminal Mapping Using Data Mining Techniques and Generalized Gaussian Mixture Model
Jun 2012
Lot of research is projected to map the criminal with that of crime and it is observed that there is still a huge increase in the crime rate due to the gap between the optimal usage of...
Provided by International Journal of Computer Science and Communication Networks (IJCSCN)
-
Whitepapers
Evaluating Service Description to Guarantee Quality of U-Service Ontology
Jun 2011
Efficient service description and modeling methodologies are essential for dynamic service composition to provide autonomous services for users in ubiquitous computing environments. In the...
Provided by KIPS
-
Whitepapers
An Enhanced Workflow Reengineering Methodology for SMEs
Aug 2012
Business Process Reengineering (BPR) is not just the program of business process improvement, but it improves the operations of the business process as a whole. Workflow Reengineering Methodology...
Provided by Universiti Kebangsaan Malaysia
-
White Papers
Increase Nationwide Rollout & Global Technology Deployment Service Efficiency: 2 of 4 in the Series "A Guide to Selecting the Right Technology Rollout Company for Your Project"
Dec 2008
To ensure you are getting the most efficient nationwide or global technology rollout, a unified Rollout Services Model is critical. As the second part of the Technology Rollout System, the Rollout...
Provided by Concert Technologies
-
White Papers
Why Project and Portfolio Management Matter More At Recession Time
Nov 2008
IT departments scaling back on project work as the economy lurches toward a recession may be tempted to skimp on project management and portfolio management. But think twice: doing so could cost...
Provided by Planview
-
Case Studies
Case Study: Old Dominion Freight Line, Inc. Plans for Future Growth with PlanView
Jul 2008
This case study outlines how one company plans for future growth with project and portfolio management from Planview. In the past ten years, Old Dominion has nearly quadrupled its size. This level...
Provided by Planview
-
Webcasts
TechNet Webcast: Performance Management Using Project Server 2007 and PerformancePoint Server 2007 (Level 200)
Dec 2008
The Microsoft Enterprise Project Management (EPM) Solution allows users in an enterprise environment to create, select, plan, and manage projects over their lifespan. The EPM Solution includes...
Provided by Microsoft
-
White Papers
IDC White paper: How Project and Portfolio Management are Delivering Value to Organizations to Enhance Their Current Knowledge of PPM
Sep 2008
If you're still managing your IT projects and portfolios with spreadsheets, you may be falling behind. Disconnected, manual systems don't provide the visibility you need to make fact-based...
Provided by CA
-
Case Studies
Telenet Gains End-to-End Control of Supply Chain and Project Management Processes
Dec 2008
Telenet wanted to replace legacy project management system - which was highly customized and difficult to maintain - with a solution that could support large, network-installation projects and...
Provided by Oracle
-
Webcasts
Microsoft Office System Webcast: Setting the Baseline, Re-Setting the Baseline, and Tactics for Multiple Baselines in Project 2007 (Level 200)
Jan 2009
The presenter of this webcast demonstrates how to use Microsoft Office Project 2007 as an effective management and tracking tool. Office Project 2007 can help to manage a project during...
Provided by Microsoft
-
White Papers
Wake Up and Smell the Coffee: Evaluation Methodology for the 21st Century
Apr 2008
The paper explores the consequences of their collective inattention to methodology on innovation, makes recommendations for addressing this problem in one domain, and provides guidelines for other...
Provided by Association for Computing Machinery
-
White Papers
Transactional Boosting: A Methodology for Highly-Concurrent Transactional Objects
Feb 2008
This paper describes a methodology for transforming a large class of highly-concurrent linearizable objects into highly-concurrent transactional objects. As long as the linearizable implementation...
Provided by Association for Computing Machinery
-
White Papers
Buffered Coscheduling: A New Methodology for Multitasking Parallel Jobs on Distributed Systems
Jan 2008
Buffered coscheduling is a scheduling methodology for time-sharing communicating processes in parallel and distributed systems. The methodology has two primary features: communication buffering...
Provided by Los Alamos National Laboratory
-
White Papers
MACEDON: Methodology for Automatically Creating, Evaluating, and Designing Overlay Networks
Jan 2008
Currently, researchers designing and implementing large-scale overlay services employ disparate techniques at each stage in the production cycle: design, implementation, experimentation, and...
Provided by Duke University (Fuqua-Global)
-
White Papers
Online Behavioral Analysis and Modeling Methodology (OBAMM)
Dec 2007
This paper introduces a novel method of tracking user computer behavior to create highly granular profiles of usage patterns. These profiles, then, are used to detect deviations in a users' online...
Provided by Dartmouth College
-
White Papers
Optimizing the Management of Infrastructure Projects in State and Local Government
Jan 2009
State and local governments face numerous challenges when initiating and overseeing public works projects. These include the rising cost of administrative overhead, poor visibility into project...
Provided by Vecna Technologies
-
Whitepapers
Adapting the Scrum Project Management Method for Geographically Separated Teams
Nov 2008
Scrum, an iterative, incremental process of software development that's commonly used with agile development, was originally developed by Ken Schwaber. It combines an iterative approach to...
Provided by IBM
-
White Papers
Application Lifecycle Management as a Business Process
Dec 2008
As business processes become more dependent on software, getting that software right gets ever more important. And because the most important software in an organization is typically developed...
Provided by Microsoft
-
White Papers
Tools for Team Development: Why Vendors are Finally Getting It Right
Dec 2008
Most software development is done by teams of people. Yet even though tools to support team-based development have been available for some time, they weren't always as useful as they might have...
Provided by Microsoft
-
Case Studies
Facilities Management Company Saves Money and Cuts Project Management Time in Half
Nov 2007
The Linc Group (Linc) provides facilities management and building system services to more than 100,000 customers in 45 states and internationally. Linc cost-effectively maintains and improves...
Provided by Microsoft
-
Case Studies
Bank Cuts Project Management Time by 25 Percent and Increases Employee Productivity
Nov 2007
Founded in 1914, Banco Nacional de Costa Rica (BNCR) is the largest state-owned bank in Costa Rica, with more than 1.3 million clients. It is subject to a very high level of accountability from...
Provided by Microsoft
-
Case Studies
Microsoft Improves Project Portfolio Selection
Nov 2007
Microsoft Office Project Portfolio Server 2007 is a top-down portfolio management solution that Microsoft Information Technology (Microsoft IT) uses to identify, select, and deliver a set of...
Provided by Microsoft
-
Case Studies
Project Management Solution Streamlines Processes and Improves Collaboration
Mar 2008
As one of the fastest-growing retail companies in the Russian market, household appliance and electronics retailer M.VIDEO was finding it increasingly difficult to manage the opening of new stores...
Provided by Microsoft
-
White Papers
Bet Your Excel Spreadsheet Can't Do This - Align IT and Business with Demand Management
May 2008
In this white paper, renowned Project Portfolio Management (PPM) luminary, and former PMI President and Chairman, Harvey Levine discusses the newest approaches to Demand Management, and how you...
Provided by Serena Software
-
Webcasts
Microsoft Webcast: Office Project: Tracking Essentials (Level 100)
Mar 2008
Microsoft Office Project is not just for project planning and communicating, but it is also an effective project tracking and analyzing tool. Once a project begins, managing change and keeping the...
Provided by Microsoft Tips
-
Webcasts
Improve Quality in Your Application Delivery Process - A Success Story at Arizona Federal
Mar 2008
IT organizations today face the perennial challenge of staying within budget, meeting time-to-market demands, and increasing quality. It might appear that you have to sacrifice one goal to achieve...
Provided by Compuware
-
Case Studies
New Solution Helps Deliver Projects on Time and on Budget
Feb 2008
A leading energy company with a nationwide presence, Mighty River Power has at least 30 strategic IT projects underway and an additional 100 proposals under consideration at any one time. Staffing...
Provided by Microsoft Tips
-
Whitepapers
IBM POWER6 Microprocessor Physical Design and Design Methodology
Nov 2007
The IBM POWER6e microprocessor is a 790 million-transistor chip that runs at a clock frequency of greater than 4 GHz. The complexity and size of the POWER6 microprocessor, together with its high...
Provided by IBM
-
Case Studies
Pathfinder Helps Leading Online Brokerage optionsXpress Maximize Customer Adoption
Dec 2007
optionsXpress (NASDAQ: OXPS), is a top-ranked Chicago-based online brokerage providing individual investors with powerful tools for stock and options trading education, evaluation and execution....
Provided by Pathfinder Development
-
Case Studies
Enterprise-Wide Service Oriented Architecture and Methodology for the Emirates Group
Jan 2008
MindTree Consulting, based on its experience in internet technologies and in the travel domain, was selected to define the next generation Service Oriented Architecture (SOA) that would become the...
Provided by MindTree Consulting
-
Case Studies
Application Development, Application Management, and Infrastructure Management for a Leader in the Travel Domain
Dec 2007
MindTree Consulting leveraged its expertise in the travel domain and its experience in application development and maintenance to execute new application development and maintain existing...
Provided by MindTree Consulting
-
Case Studies
End-to-End Interoperability Testing of a Global e-Commerce System Ensures Reliability for Vicataulic
Feb 2008
For over 80 years, Victaulic is the world's leading producer of mechanical pipe joining systems with manufacturing and distribution facilities worldwide and over 3,200 employees. The company's...
Provided by MindTree Consulting
-
Case Studies
Rapid Functionality Updates With Higher ROI Through Dedicated ODC for the World's Largest e-Marketplace
Jan 2008
The client is the world's largest online retailer with over USD 6 billion of revenue in 2006, 240+ million registered users, and 649,000 online stores worldwide selling over 50,000 categories of...
Provided by MindTree Consulting
-
Case Studies
BPCS Implementation and Upgrade Support to Consolidate Asia Pacific Operations for a Global CPG Giant
Jan 2008
MindTree Consulting designed and implemented the customization, integration, and upgrade of BPCS systems in the Asia Pacific region for a global Consumer Products Goods (CPG) company. The client...
Provided by MindTree Consulting
-
Webcasts
Microsoft Webcast: Office Project: Planning Essentials (Level 100)
Feb 2008
This webcast shows how to easily set up project plans using all the enabling tools in Office Project. It walks through a proven planning process using project management best practices for...
Provided by Microsoft
-
White Papers
Managing Virtual Project Teams: Getting the Team Off on the Right Foot
Nov 2007
Getting the team off to a good start can be a challenge. By involving the entire team in the planning phase and delegating decision-making authority, team members gain a sense of ownership that...
Provided by ameelo.com
-
Case Studies
How Cisco IT Migrated to an ERP Technical Support Module
Dec 2007
Within the IT world, engineers are considered the most challenging user base when it comes to technology change. The biggest challenges associated with this project were user-focused. Convincing...
Provided by Cisco Systems
-
White Papers
Serena Mariner Guide to Increasing Project Visibility
Nov 2007
Managing a project portfolio can take you into rough waters. The Serena Mariner Guide to Increasing Project Visibility tells you how to keep on an even keel and get to your destination intact....
Provided by Serena Software
-
White Papers
Fujitsu's Business Continuity Plan Development Methodology
Apr 2007
In today's high-risk business environments, more and more companies are focusing on the Business Continuity Plan (BCP) as a management methodology for improving their ability to respond to any...
Provided by Fujitsu
-
Resource Center
IBM Rational Systems Development Solution eKit
Dec 2007
As systems increase in complexity, communication between systems and software teams becomes more and more difficult. Included in this kit are educational white papers, customer examples,...
Provided by IBM
-
Whitepapers
Reducing Risk Through Requirements-driven Quality Management: An End-To-End Approach
May 2007
When IT undertakes a development project, it contracts with the business which requirements will be fulfilled and when they will be delivered. No attorney would permit his client to sign a legal...
Provided by Hewlett-Packard (HP)
-
White Papers
Software Testing 3.0: The Continuing Evolution of Software Testing
Dec 2007
This paper traces the evolution of software testing through its first two phases, and then presents the current state-of-the-practice: Software Testing 3.0, an independent and strategic approach...
Provided by LogiGear
-
White Papers
Ensuring Code Quality in Multi-threaded Applications
Dec 2007
Today, the world of software development is presented with a new challenge. To fully leverage this new class of multi-core hardware, software developers must change the way they create...
Provided by Coverity
-
Webcasts
A Lifecycle Approach to Requirements-Driven Quality Management
Sep 2007
The ability to evaluate and mitigate risk is critical to increasing the chance for a successful business outcome to a development project. The move to end-to-end business process based...
Provided by Hewlett-Packard (HP)
-
Case Studies
Solution Provider Delivers Greater Flexibility to Customers
Oct 2007
Affordable Business Solutions (ABS) provides business process and analytics consulting combined with IT solutions for small businesses. To add value for its customers, ABS opted to offer Microsoft...
Provided by Microsoft
-
Research
The Components of a Quality Business Case
Jul 2007
Business cases are following their own "maturity model" as they move from filling the need for obtaining funds for a standalone initiative to being a driver for project planning, serving as the...
Provided by Forrester Research
-
White Papers
Virtual Project Management
Aug 2004
Virtual Project Management (VPM) is the Information Age equivalent of management by walking around. Executives will have to manage virtually without Travel. The rise of the Internet and...
Provided by Birlasoft
-
White Papers
Eight Things Your Business Analysts Need to Know: A Practical Approach to Recognizing and Improving Competencies
Feb 2006
Each year, organizations across the globe face astronomical project failure rates, often wasting millions of dollars per failed project. This paper examines the roots of project failure and...
Provided by ESI International
-
Downloads
Download Savvion's Free Business Process Modeling Software
Jul 2006
The first step in improving your business processes is to articulate precisely where bottlenecks exist, and the most efficient way to do that is by simulating your existing processes using...
Provided by Savvion
-
White Papers
IT Governance - An Integrated Framework and Roadmap: How to Plan, Deploy and Sustain for Competitive Advantage
Mar 2006
The issues, opportunities and challenges of effectively governing an organization's Information Technology (IT) demands, investments and resources has become a major concern of the Board and...
Provided by CA
-
White Papers
Requirements Management: Identify, Specify, Track and Control Requirements Using a Standard Process
Aug 2003
Requirements are an integral part of the development process connected through traceability with marketing specifications, analysis diagrams, design models, code files, test procedures and...
Provided by Excel Software
-
Whitepapers
Issues of Structured Vs. Object-Oriented Methodology of Systems Analysis and Design
Aug 2004
In recent years, there has been a surge of interest in Object-Oriented (OO) methodology in the analysis and design of a system. However, there is a dilemma as to how best fit the OO topics with...
Provided by University of Houston-Clear Lake
-
White Papers
Software Engineering Ontology: A Development Methodology
Nov 2004
This paper has presented the results of the first phase of a project aimed at developing a comprehensive ontology of the Software Engineering field. The major contributions provided by this study...
Provided by University from Quebec in Montreal
-
White Papers
Methodology of Knowledge Management Implementation
Jun 2005
Today, knowledge is the strategic key resource. Knowledge management is an approach that many commercial companies use to deal with knowledge. Nevertheless, it is still very difficult to find a...
Provided by Formatex
-
White Papers
Development of Virtual Teams and Learning Communities
Jun 2005
Students of an Internet based course in project management have during a 20 week period worked in teams of 4-6 persons. The course consisted of Swedish students living in Sweden or abroad making...
Provided by Formatex
-
White Papers
Project Management Methodology in Human Resource Management
Mar 2006
The concept of project management methodology can be leveraged to add value to an institution's strategic initiatives. This paper provides an overview of project management methodology, when it...
Provided by Dartmouth College
-
White Papers
The Need for Agile Project Management
Jan 2003
One of the common misperceptions about agile processes is that there is no need for project management, and that agile projects run themselves. It is easy to see how an agile process' use of...
Provided by Control Chaos
-
White Papers
Enhance Your Project Documentation Process With Oracle Applications Implementation Methodology (AIM)
Jun 2003
Having supported many software implementations including those of ERP systems the author have found that project documentation is one area which requires significant improvement. This paper...
Provided by RPC Data
-
White Papers
Selecting the Right Project Management Methodology
Mar 2006
Many professionals are not aware of the differences between project management methodologies and System Development LifeCycles (SDLCs) / product methodologies, or why it is important to use a...
Provided by KLR Consulting
-
Webcasts
Create a Milestone
Jan 2008
A milestone is a task that represents a reference point, such as the end of a major phase of a project. Typically, milestones have a duration of zero days, but they can have any duration. In this...
Provided by Microsoft
-
Webcasts
Microsoft Office System Webcast: Creating Custom Stakeholder Views in Project 2007 (Level 200)
Nov 2008
Creating project status reports for multiple stakeholders can be challenging since each stakeholder often requires different information in a different format. Microsoft Office Project 2007 has...
Provided by Microsoft
-
Webcasts
TechNet Webcast: Microsoft Office Project Server 2007: Workload Scenarios and Reference Architecture (Level 300)
Nov 2008
This webcast covers Microsoft Office Project Server 2007 workload scenarios and reference architecture to help to plan the deployment. The presenter discusses typical product operations broken out...
Provided by Microsoft
-
Webcasts
Momentum Webcast: Advantages of the Microsoft Office Enterprise Project Management Solution (Level 100)
Apr 2007
When it comes to project management in most organizations, executives want visibility, insight, and control, while team members want effective collaboration capabilities. IT managers want systems...
Provided by Microsoft
-
White Papers
Why Use the SAP ASAP Methodology?
Jan 2012
In the mid 1990's SAP had gained a significant amount of bad press and publicity around several high profile project disasters that the company knew were completely avoidable. At that time Oracle,...
Provided by R3Now.com
-
Podcasts
Business Intelligence Innovation at Gallup
Mar 2012
Gallup is in the "intelligence" business - their survey's and consulting services deliver relevant, timely, and visionary research on what people around the world think and feel. Ironically one of...
Provided by Oracle
-
Whitepapers
Tape Storage Future Directions and the Data Explosion
Apr 2012
It's time to bring your views of tape up to date as the future for tape technology has never been brighter. Today's tape technologies combined with disk technologies in a strategic blended...
Provided by IBM
-
Whitepapers
Uplift quality with Requirements Driven Testing
Jan 2012
Most business and IT executives agree that any company that is able to rapidly deliver software of high and predictable quality with minimum budgets enjoys a significant advantage. However,...
Provided by Micro Focus
-
White Papers
Characterizing User Mobility in Second Life
Aug 2008
In this paper, the authors present a measurement study of user mobility in Second Life. They first discuss different techniques to collect user traces and then focus on results obtained using a...
Provided by Association for Computing Machinery
-
White Papers
Finding the Right Fit: Five Criteria for Evaluating Telecom Management Tools
Feb 2012
It's the start of a new fiscal year. The annual IT budget has been approved, and one have commenced their search for a telecom management software that will help one better navigate the...
Provided by Vcom3D
-
Whitepapers
Change How Business Intelligence is Managed
Jul 2012
With the revolution of in-memory computing already under way, the question isn't if this revolution will impact businesses but when and, more importantly, how. Similar to the advance of enterprise...
Provided by SAP
-
Whitepapers
Six Sigma Methodology Utilization in Telecom Sector for Quality Improvement-A DMAIC Process
Jan 2011
This paper presents tools of Six Sigma for Telecom Industries; these can achieve powerful operational improvements that produce sustainable business benefits. Six Sigma Qualtec's dedicated Six...
Provided by International Journal of Engineering Science and Technology (IJEST)
-
Case Studies
How Cisco IT Designed a Separate Network to Test Cisco Alpha Equipment
Dec 2007
At Cisco, reducing Customer-Found Defects (CFDs) is a top priority and is an initiative mandated by CEO John Chambers. Cisco product engineering methodologies require field trials with live...
Provided by Cisco Systems
-
Whitepapers
Feature Specific Criminal Mapping Using Data Mining Techniques and Generalized Gaussian Mixture Model
Jun 2012
Lot of research is projected to map the criminal with that of crime and it is observed that there is still a huge increase in the crime rate due to the gap between the optimal usage of...
Provided by International Journal of Computer Science and Communication Networks (IJCSCN)
-
Whitepapers
Evaluating Service Description to Guarantee Quality of U-Service Ontology
Jun 2011
Efficient service description and modeling methodologies are essential for dynamic service composition to provide autonomous services for users in ubiquitous computing environments. In the...
Provided by KIPS
-
Whitepapers
Planning a Project with the IBM Rational Unified Process
Aug 2003
This white paper, written for project managers and software development managers who are about to embark on the process of planning for a software development project, describes a practical...
Provided by IBM
-
Whitepapers
An Enhanced Workflow Reengineering Methodology for SMEs
Aug 2012
Business Process Reengineering (BPR) is not just the program of business process improvement, but it improves the operations of the business process as a whole. Workflow Reengineering Methodology...
Provided by Universiti Kebangsaan Malaysia
-
White Papers
Increase Nationwide Rollout & Global Technology Deployment Service Efficiency: 2 of 4 in the Series "A Guide to Selecting the Right Technology Rollout Company for Your Project"
Dec 2008
To ensure you are getting the most efficient nationwide or global technology rollout, a unified Rollout Services Model is critical. As the second part of the Technology Rollout System, the Rollout...
Provided by Concert Technologies
-
White Papers
Why Project and Portfolio Management Matter More At Recession Time
Nov 2008
IT departments scaling back on project work as the economy lurches toward a recession may be tempted to skimp on project management and portfolio management. But think twice: doing so could cost...
Provided by Planview
-
Case Studies
Case Study: Old Dominion Freight Line, Inc. Plans for Future Growth with PlanView
Jul 2008
This case study outlines how one company plans for future growth with project and portfolio management from Planview. In the past ten years, Old Dominion has nearly quadrupled its size. This level...
Provided by Planview
-
Webcasts
Microsoft Office System Webcast: Reports and Visual Reports in Project 2007: Working With Excel (Level 200)
Dec 2008
With Microsoft Office Project 2007, it is easy to communicate and present project information by applying charts and diagrams from Microsoft Office Excel to create custom reports based on Office...
Provided by Microsoft
-
Webcasts
TechNet Webcast: Performance Management Using Project Server 2007 and PerformancePoint Server 2007 (Level 200)
Dec 2008
The Microsoft Enterprise Project Management (EPM) Solution allows users in an enterprise environment to create, select, plan, and manage projects over their lifespan. The EPM Solution includes...
Provided by Microsoft
-
Webcasts
TechNet Webcast: Microsoft Office Project Server 2007: Network Communication (Level 300)
Dec 2008
This webcast covers Microsoft Office Project Server 2007 network communication - specifically ports, protocols, and network traffic. The webcast presents network considerations when deploying...
Provided by Microsoft
-
Webcasts
Momentum Webcast: Compass for Project Management (Powered by Windows SharePoint Services) (Level 100)
Dec 2008
Project-based companies can now take advantage of their investment in Windows Server by utilizing project management software that they already own. If a company is running Microsoft Windows 2000...
Provided by Microsoft
-
White Papers
IDC White paper: How Project and Portfolio Management are Delivering Value to Organizations to Enhance Their Current Knowledge of PPM
Sep 2008
If you're still managing your IT projects and portfolios with spreadsheets, you may be falling behind. Disconnected, manual systems don't provide the visibility you need to make fact-based...
Provided by CA
-
Case Studies
Telenet Gains End-to-End Control of Supply Chain and Project Management Processes
Dec 2008
Telenet wanted to replace legacy project management system - which was highly customized and difficult to maintain - with a solution that could support large, network-installation projects and...
Provided by Oracle
-
Webcasts
Microsoft Office System Webcast: Setting the Baseline, Re-Setting the Baseline, and Tactics for Multiple Baselines in Project 2007 (Level 200)
Jan 2009
The presenter of this webcast demonstrates how to use Microsoft Office Project 2007 as an effective management and tracking tool. Office Project 2007 can help to manage a project during...
Provided by Microsoft
-
White Papers
Wake Up and Smell the Coffee: Evaluation Methodology for the 21st Century
Apr 2008
The paper explores the consequences of their collective inattention to methodology on innovation, makes recommendations for addressing this problem in one domain, and provides guidelines for other...
Provided by Association for Computing Machinery
-
White Papers
Transactional Boosting: A Methodology for Highly-Concurrent Transactional Objects
Feb 2008
This paper describes a methodology for transforming a large class of highly-concurrent linearizable objects into highly-concurrent transactional objects. As long as the linearizable implementation...
Provided by Association for Computing Machinery
-
White Papers
Buffered Coscheduling: A New Methodology for Multitasking Parallel Jobs on Distributed Systems
Jan 2008
Buffered coscheduling is a scheduling methodology for time-sharing communicating processes in parallel and distributed systems. The methodology has two primary features: communication buffering...
Provided by Los Alamos National Laboratory
-
White Papers
MACEDON: Methodology for Automatically Creating, Evaluating, and Designing Overlay Networks
Jan 2008
Currently, researchers designing and implementing large-scale overlay services employ disparate techniques at each stage in the production cycle: design, implementation, experimentation, and...
Provided by Duke University (Fuqua-Global)
-
White Papers
Online Behavioral Analysis and Modeling Methodology (OBAMM)
Dec 2007
This paper introduces a novel method of tracking user computer behavior to create highly granular profiles of usage patterns. These profiles, then, are used to detect deviations in a users' online...
Provided by Dartmouth College
-
White Papers
Optimizing the Management of Infrastructure Projects in State and Local Government
Jan 2009
State and local governments face numerous challenges when initiating and overseeing public works projects. These include the rising cost of administrative overhead, poor visibility into project...
Provided by Vecna Technologies
-
Whitepapers
Adapting the Scrum Project Management Method for Geographically Separated Teams
Nov 2008
Scrum, an iterative, incremental process of software development that's commonly used with agile development, was originally developed by Ken Schwaber. It combines an iterative approach to...
Provided by IBM
-
White Papers
Application Lifecycle Management as a Business Process
Dec 2008
As business processes become more dependent on software, getting that software right gets ever more important. And because the most important software in an organization is typically developed...
Provided by Microsoft
-
White Papers
Tools for Team Development: Why Vendors are Finally Getting It Right
Dec 2008
Most software development is done by teams of people. Yet even though tools to support team-based development have been available for some time, they weren't always as useful as they might have...
Provided by Microsoft
-
White Papers
Weathering the Perfect Storm: How Executives and Boards Can Help Improve Large Technology Projects
Feb 2009
For too many organizations, major information technology projects turn out badly. The demand planning project that was intended to revolutionize the business, but now forecasts large overruns. The...
Provided by Brand Velocity
-
White Papers
How to Structure Your First BPM Project to Avoid Disaster
Sep 2008
During these challenging economic times, process improvement projects are one of the handful of projects to receive funding. Why? Business Process Management (BPM) provides exactly the right...
Provided by Lombardi Software
-
White Papers
Increase Nationwide Rollout & Global Technology Deployment Service Efficiency
Dec 2008
When one has a technology rollout to deploy on a nationwide or global scale, service efficiency is critical. While missed deadlines and unbudgeted project costs are always a concern, they should...
Provided by Concert Technologies
-
White Papers
Lower Project Costs & Time of Technology Rollouts
Feb 2009
This paper explains a Technology Rollout System, how it lowers costs and saves time without compromising quality, and provides essential questions to ask any technology rollout company. Suppose...
Provided by Concert Technologies
Keep Up with TechRepublic
Submit a Paper
Get your content listed in our directory!
Our directory is the largest library of vendor-supplied technical content on the Web. It’s also the first place IT decision makers turn to when researching technology solutions. Our members are already finding your competitors’ papers here - shouldn’t they find yours, too? It's FREE so click here and submit your white paper, case study, data sheet, research report, or other document today!



