Delay Analysis of IEEE 802.11 DCF With Modified Binary Exponential Backoff

In the design of wireless networks the Medium Access Control (MAC) protocols have a very high impact on the performance of the network. The IEEE 802.11 is widely accepted technology for the Wireless LANs has been used by wireless networks. Delay is one of the important parameter to measure the performance of the wireless networks. The authors give a delay analysis of the Distributed Coordination Function of IEEE 802.11 under modified Binary Exponential Backoff (BEB) Algorithm using Frequency Hoping Spread Spectrum (FHSS).
Provided by: Academy & Industry Research Collaboration Center Topic: Mobility Date Added: Jun 2011 Format: PDF

Find By Topic