Throughput and Delay Analysis of Access Point in IEEE 802. 11B Wireless LAN using Opnet Simulator

Download Now
Provided by: International Journal of Computer Applications
Topic: Mobility
Format: PDF
In this paper, the authors analyze the throughput and Delay performance of IEEE 802.11b Wireless Local Area Network (WLAN) with one access point. The IEEE 802.11b is a wireless protocol standard. In this paper, a wireless network was established which has one access point. OPNET IT guru simulator (academic edition) was used to simulate the entire network. In this paper, they considered the effects of varying the data-rate were observed on the throughput and delay performance metric. Several simulation graphs were obtained and used to analyze of wireless network with good throughput and minimum access delay.
Download Now

Find By Topic