1 reply
by haris
hi,
in order to appraise the project and the project team consider the following:
1. did the project team collected and verified requirements?
2. Were the users of the system involved in collecting the requirements?
3. Was a plan prepared for the project and how well the plan was followed?
4. How many issues were identified during the project and what was the turn around time on the project.
5. How effective was the communication with the project team.
6. How well does the system finally delivered corresponds to the initial requirements and plan.
Going through these questions will help you appraise the IT project.
Having a lot of problems with the setup and configuration of the system is an indication that the team did not had done the analysis right, the plan was not correct. Such situations are idicative of a lack of expertise and show that things are setup and configured as they break or as they are encountered. That is, things were not planned well.
Regards,
Haris
This discussion is closed to new replies.
Trending IT Employment posts
Sort by Trending