I am not aware of a method by which you can do that.
However, I have an idea for you, you can copy the slide that has the HyperLinks and put it next to the slide which has the points which are brought up with a click.
Another option would be to link this slide to the original slide with a Hyperlink as well.
Hope this helps you out.
Best Regards,
Rafik El-Raheb.
by twlavely
by jcombs
If I understand this correctly you have an "overview" slide with hyperlinks to subpoints in your outline, when the user has finished viewing all of these detailed subpoints you want the users next click to take him/her to the original "overview" slide, and then the next click would take the user to the next slide in your sequence. If this is correct, this is how I would do it. Copy the "overview" slide and paste it into your outline as the slide after your last subpoint, as suggested in answer 1. However, then remove all active content (i.e. the hyperlinks) so that the users next click on anything will load the next slide.
Hope this helps,
Josh