Discussion Locked

All home improvement contractors must die

0 helpful
61 replies
Closed to new repliesThis discussion is closed. It stays readable, but it takes no new replies.

//begin rant 1.0//

Why is it that when you pay somebody to do work, they never do it right the first time? Is it a lack of education, poor genetics, lack of pre-natal care? Did their mother smoke (crack?) during the pregnancy?

Why does it fall on me, the homeowner, to educate the contractor about building codes, best practices, and common sense?

For example, right now I am getting the raised wood deck replaced on my house. I did LOTS of due dillgence, checked references, etc.

And yet....

I'm having to explain to them:

- why a 'temporary beam' to pass inspection is a bad idea
- why soil contact with wood is bad
- why 3/8" bolts are not code-compliant for guard-rail attachment
- why it's a bad idea to tap their ungrounded extension cord into the 30AMP service-disconnect for my AC unit.
- why joist hangers exist, and the startling news that there are even different size joist hangers for different sized joists...so therefore using a 8" hanger on a 10" joist is not correct.

Or why it's a bad idea to let one of the worker's 8 year old son roam unsupervised under the deck (on temporary supports) for three hours last Friday. (have that on CCTV footage)

Today I found they installed the posts in the ground, using only the (code minimum) 12" of concrete in the hole, the rest filled up with soil. Technically it 'meets code' but keep in mind the Southern US is second only to Hawaii for termites.

After a somewhat heated argument with the owner of the deck company, I have made the vow...never again hire anybody to do anything. I used to do it all myself, and I guess I need to get back to that again.

//end rant//

61 replies

by cmiller5400

As long as they get their money, they don't care how the work is done (if you are lucky to have the work done or some of it.)

Lets hope they fry themselves up a lesson when they tap into your 30 AMP breaker (or at least shock some sense into them :D ).

I am a strong supporter and follower of the philosophy of Mike Holmes from [i]Holmes on Holmes[/i]. "Spend your money wisely and do it right the first time" is a paraphrase from him.

At least you caught the guy red handed and can have these things fixed early in the game. Just curious, did the contract you signed have anything about how the structure was to be built? (minimum code, materials used etc)

by robo_dev

Angies List, Kudzu.com, Home Reports.com, has a perfect BBB rating, their references check out. I verified their W/C and Liability insurance. These guys are supposedly the 'deck guys to use'.

To be fair, there are some things they did well, The quality of the carpentry is excellent. They miter the corners on the framing, router and/or sand the corner of every board you see. It's a pretty deck. It's just when the termites come, or when the twister comes, I don't want to see a heap of splintered wood in my backyard....plus things like the guard-rail attachment is obviously important, as the deck is about 12 feet off the ground.

The beauty of video surveillance it that today during a slow time at work I am going to review EXACTLY how much concrete went into each hole. If I see them shoveling construction debris into the holes..... :(

The mistake I made was that the specifications, while fairly detailed, were not detailed enough.

I assumed that the post holes would be filled with concrete, as that is normally how it's done.

Again and again I heard from these guys 'we've built a hundred decks like this, and they all passed inspection' and look at me like I'm some perfectionistic geek.....(well that part is true).

by tigger_two

Robo, I disagree with the idea that, because you have standards, they are unreasonable or that you are BEING unreasonable.

Once upon a time, I had wall to wall carpet through every room in the house save the kitchen, bathrooms, and utility room. It was a light grey color.

After my husband died, it became apparent that the carpet had become fodder for an episode of CSI. The stains included every possible bodily fluid and a variety of other things, none of which were willing to relinquish their hold on what wasn't an attractive or durable floor covering to begin with. Replacement of said carpet was the best choice.

I interviewed a number of highly rated flooring companies on the way to choosing one. They were all required to provide references and I made sure to have my mother in law at each meeting.

The resulting job was done well, but I had a few issues that I felt strongly that they needed to revisit- the carpet on the stairs came loose, one board in the middle of the room that should never have been used, gouges left when the contractor dragged something over the newly laid floor.

Were these things minor? Probably. Could I have dealt with them myself? Possibly. Was I willing to? No way in h*ll. I had paid a lot of money for the job and I expected it to be done to my satisfaction.

To their credit, the company not only resolved the issues I had, they paid a cleaning person to come in for four hours at my direction. They met, and exceeded my expectations. I recommend them to anyone looking to do their flooring. Since they also do kitchen remodels, I will call them when I am ready to do that. When they learned that I was looking for a painter, they offered me a referral to someone who was not only well priced but also did an outstanding job.

The dark side? There are household tasks that I can no longer do. I have been in search of a cleaning person for ages. I have tried three so far and have yet to find someone who even MEETS my expectations, much less exceeds them. Each time, I have clarified what I need done and provided checklists of tasks.

Am I being too picky? I don't think so. As long as I am the customer and paying the fee, I believe I have the right to call the shots.

I don't think that you are out of line at all. Unfortunately, in this case you may not have recourse. You DO have the ability to voice your honest opinion of the job as well as your misgivings to Angie's List and any other site you used that allows for customer feedback.

(((hugs))) Robo. The fault isn't with you in this.

by hal 9000

[i]Why does it fall on me, the homeowner, to educate the contractor about building codes, best practices, and common sense?[/i]

They are probably right that they have built hundreds of decks and they look great but how do they look after the first big storm hits or lets say 5 years after they where built?

Most of these places only look at the finished product when it's first built and don't give a Rats what happens down the track.

Also no matter what you specify they do things to a price, doesn't matter what you wanted or specified they do things as cheaply as possible as it makes them look good to their bosses. They also very rarely need to repair the mess that they have made so they simply do not care.

Like for instance my mother bought a fridge it was actually delivered on the 10 January 2010 and on the 9 January 2012 one of their Authorized Techs had been out looked at it and reported it as Unrepairable. Apparently a Gas Line inside the cabinet had ruptured allowing the refrigerant gas to escape and preventing it from being regassed.

The Company in question makes a Big Deal out of being Green but I really fail to see how sending a unit to Land Fill after 2 years and before the warranty runs out is in any way Green.

Or the Daughter had a tree fall on her house yesterday. She rang the people who owned the yard that the tree fell from and their first question was [b]Does your house have any damage?[/b] Doesn't matter that there is a 80 foot tree lying across the roof or that it's a perfectly still day with no wind or rain just how the hell are you supposed to know exactly how much damage there is?

The owners Representative said well as there is no rain entering it can not be too bad and we'll see about getting it removed within the next month. I just do not understand these people or even begin to understand how they think for a single second that they will not have to pay for the damage that they have caused.

OH and Robo why don't you say exactly what you think? I personally wouldn't pull any punches when describing substandard work that needs redoing correctly but maybe that's just me and my family as I know that my father did the same thing when he had his house built. He drove the Builders Nuts with complaints as did my brothers when they had their houses built.

Col

by robo_dev

It was like arguing with your cat....it did not go well.

He was going on about how burying a post in the dirt meets code, but I explained that I expected it to be done differently.

I said to him, what if you gave your wife a pile of cash and said "Go buy a shiny new Black Lexus Sedan" and she came back with a Black 1994 Honda Accord. They both 'Meet Code' in that they have four wheels, brakes, and meet all the Federal safety standards, so what's the big deal? They have a steering wheel and seats and so forth.....

by hal 9000

They have done the work properly as far as they are concerned.

Doesn't matter that it's not going to last any time at all and need expensive repairs in a few years they have done what they said they would. Well at least as far as they are concerned. ;)

Like most places provided that it looks good it's good. Last year we had some contractors here after the son fell through a railing on a deck about 15 feet off the ground and hit the ground. Apparently sticking a Coach Bolt into the outside of a bit of Pine meets the Minimum Regulations here and the railings don't have to be inside the uprights so that the wood actually holds it in place you can bolt it in place and it's not your problem till it fails and someone sues you.

Anyway they did a lovely job in replacing the badly made Railings and the rotted decking material and left it bare unpainted. Not even so much as any undercoat covering the wood Of course the nails that they used to fix the railings went rusty in very short order and now the railings need replacing again. But they lasted 6 months and look great.

I opted to screw in some very long Coach Bolts through the sides of the uprights into the top rails which where very expensive. The 6 Bolts cost me the massive amount of $8.00 and it took all of 15 minutes to drill the holes and bolt them in. And the bolts where Galvanized so they are not going to rust.

I really fail to see how they saved anything by doing half the job but they felt that they saved me money.

Shakes head as he walks away. :^0

It's the same with computers I was asked to fit a WiFi Card to a Desktop recently and when I went to get a couple of PCI Cards they tried to sell me some cheap ones which will do but I opted for the More expensive ones with a 3 year warranty. They where very expensive the cheap ones where $18.60 + 10% GST to me and the expensive ones where $19.20 + 10% GST, for the 66 cent difference I failed to see why I would bother with the cheaper cards.

Col

by ansugisalas

the eyes of a contractor glazing over slightly when you describe how you want things done, pre-hire.
It's the look of "Uh-huh, uh-huh - well, I am the expert, here - but let the little laymen feel like they know shilt, I'll just do it my way after all".
They're "professionals" after all :D

It's a good idea to have them tell you back what you just said, they might not even remember it :p

This is what's different about German engineering: Germans don't look at the "meets code", they go for "what will work" and then add 20% more steel... if it doesn't call for steel, I think they add some, just in case, so careful of the pastries! :D

by ansugisalas

I had to tell contractors that no, if I asked that they glue a threshold to the tile floor to control (but not prevent) the natural movement of the parquet floor... then it wasn't "the same" to glue the threshold TO THE FLOORING, AND NOT TO THE TILE FLOOR. Needless to say the whole floor rose up in a nice arch... nothing was holding it down. It was two centimeters off the tiles at the centre.
I had to tell them they'd have to take it off and do it according to MY instructions, not according to their next "bright idea"... the "head" guy was absolutely fuming, since it was his "thinking" I was telling them to shove into the sunless.
And that was before I told them that, no, it would not be acceptable if they simply rip the threshold off the flooring, since that would tear off a substantial amount of the flooring surface and make it look like crap, forever.
The "head" guy was about to go out the door, smoke pouring out the ears.
But then I told him he'd made a mess, and he'd have to stay and fix it, and that fixing it would involve cutting the glue with a stanley blade... all of it :D

He was absolutely convinced my method wouldn't work, up until it was done.
After that he had nothing to say :p :D

I think it all had to do with penile insufficiency :D :D :D

by ansugisalas

That's common sense, don't you know?
It's simple, if you don't, the owner of the store will have to swallow their idiotic purchase of a large pile of capacitor bloat waiting to happen... all by themselves.
It's common sense that it's better to share that kind of burden with others :D

That's another problem with common sense, it's NOT "common" as in "same from one person to another". :D :D :D

This is one of the funniest threads I've read in a long time, thanks to all!

by dogknees

Common sense would indicate that the person making the error accepts the cost of that error.

by gsg

Oh dear lord... He didn't know that wood + touching dirt = termites? And on the electricity thing, and tapping into the AC, that's how a roofer set my air conditioner on fire.

I needed to replace my deck 3 years ago, and there is no way I'm going to make it through next summer. When the house was originally built, they didn't sink the posts for the deck at all. They sort of almost leveled the ground, put a 6 x 6 concrete square on the ground, and set the post on top of that. They never sealed the deck either, so by the time I bought the house (2nd owner), the deck was already rotting.

When the idiot drove the car into my house, it was nothing but pure hell working with the contractor. I told him that I was a project manager and that I knew all of the tricks and excuses so quit pulling them on me. Something that should have taken 4 weeks took 4 freakin' months, and it only finished because I took over and started calling the sub-contractors myself.

Pure, unadulterated hell.

by hal 9000

[b]Learning Experience[/b] though wasn't it. ;)

Though I'm not quite sure why anyone would want to suffer so badly.

Col

by gsg

I learned that if you are a 14 year old boy, with oppositional defiance disorder, who has on 2 separate occasions vandalized schools to the tune of thousands of dollars, and you get mad at Grandpa and steal his car, then drive it at speeds exceeding 100 miles per hour, hit a house, and run off, then you will get arrested. And, if you've stolen a loaded pistol and tell the jail psychologist that you stold it because you wanted to know what it was like to kill someone, then despite the over $25,000 dollars worth of damage to my house, you will be sentenced to probation until the psychologist determines you can be released from the child psych hospital.

So the kid was "Punished" with a 2 week stay at a psych facility, also known as "summer camp".

by charliespencer

Depending on the circumstances, I can understand not sealing the deck. Sometimes the wood is still 'green' and hasn't fully dried out yet. -IF- that was the case, the original owner should have been informed and should have sealed it himself after four to six months.

However, not sinking the posts is inexcusable.

by gsg

The deck was built when the house was, and the builder let his daughter live in it for 5 years before I bought it. The wood was no longer green.

The joists on the deck are still good, so the plan is to rip up the planking (that was screwed to the joists with DRYWALL SCREWS), and temporarily shore up the joists, while they dig the holes and fill with concrete, then attach the joists to the permanent posts.

My task now is to find a couple of reputable comanies to come out and give me quotes. I know what the materials should cost if I did it myself, so I at least have a general idea of that part of the quote.

by boxfiddler Hot topic

The counter creeps have done pi$$ed me off. Installed a blatantly not square piece of counter, then, effectively asked, "Why don't you let us jury-rig that for you?" Ummm. NO. For what I paid for these, take that poorly cut piece of crap back, and cut me one that's CORRECT.

Not just that, either. When they installed the peninsula piece, they knocked the backside piece away from the cabinets and tried to tell me the cabinet installer didn't fasten it. Ummm... hello. I can see the nails... Grrrr....

When this project is complete, I'm posting a 'raving' review of that company and it's installers.

It's going to be gorgeous when it's finished. :D

by boxfiddler Hot topic

just fixed a radiator hose in my truck. No charge. I gave a six pack. Now, that's service. :^0

by av .

And it is a pain. We gutted our entire kitchen about 10 years ago and it was an entire month of BS like that. Between the different contractors and the permit process, it was just grueling.

Who wants a counter thats not cut right? Thats not acceptable. When they put my counter in, it wasn't cut right the first time either and I made them take it back and fix it. They did fix it, but damn! Why didn't they do it right the first time? Oh well.

In the end, I fell in love with my new kitchen. It became my new favorite room in the house and I spent LOTS of time cooking and buying new pots, pans, etc. (yes, that comes next!) to go with the new kitchen. I'm sure you'll have a lot of fun with it after its done.

Enjoy!

AV

by boxfiddler Hot topic

:D
And I bought new pots and pans for G's moms house when I thought we were moving there because hers were crap. I brought them home. I'll send my old ones there.

Today, I'm off to the grocer for bakeable things like fish, and steamer bags to use in the microwave. I'm really tired of eating out. I've got water and electric to it now, so... And oh! I just :x the new 10" deep sink!

by hal 9000

In the Mainframe Days the salespeople sold what they had stocks of and then we had to make it work for the client.

Col

by thechas

Well, the first thought that comes to mind is how well did you detail your specifications for the deck work before going out for bids and selecting a contractor?

If you just said I need a new deck and choose one of the lower bids, you are getting what you asked for. The contractor did not bid for doing the work above minimum requirements.

If you desire or want specific materials or construction used in a project, those details must be part of the proposal and then be documented in the contract for the job.

If you wish to change something after the work has started, expect to pay extra for it.

Not to say that the contractor is right on all the issues. Just that he expected to spend X amount on materials and his workers would put in X amount of time to complete the job. And then you look things over and have different expectations for materials and construction techniques.

My Father-In-Law draws up detailed requirements and terms whenever he hires work done. Right down to specific requirements for each payment for the job.

Where I work, we regularly run into not getting what we expect from outside suppliers and contractors. But, we can't do much about it because the supplier met our documented requirements. We are learning and getting better at defining proper requirements for contracts. It was easy when we did it all in-house as we could quickly interact if any detail appeared out of line or needed further definition.

Point is that in the US service economy you seldom get more that what you specified as the requirements for the job.

Chas

by charliespencer

Potter is dictating a letter to Radar, to be sent to the Supply section:

"We requested rectal thermometers; you sent spark plugs. They're useful but not interchangeable!"

by charliespencer

shoring the rest up shouldn't be too much trouble. Prop one corner, remove that post, dig the hole, drop in the post and concrete, wait overnight, then reattach the joists. Once you get the corners done, it's just lather, rinse, repeat. Slow, but safe; depends on how big a hurry you're in.

Sheet rock screws. [[snicker]] Did he tape and mud the seams between the planks too?

by gsg

He certainly didn't mud about 1/3 of the seams on the actual drywall in my house. He taped them all, just didn't mud them. Oh, and in some cases the drywall is NAILED in.

I knew all of this going in, and I got the house for under the appraisal, so it was worth it to me. Luckily, Dad used to work construction, so we did a lot of skim coats, sanding, etc... before we repainted.

by nicknielsen

I'm getting ready to have a new roof put on the house. I'm asking for estimates from five A-rated contractors off Angie's List. The difficult part is the roof has multiple slopes (2-1, 1-1, and 1-4), three gables, and four chimneys. My brother-in-law says I'll pay about a 10-20% premium because of the steep roofs. Thankfully, I have the replacement cost rider on the homeowner's B-) , so the insurance company says they'll give me over 9 grand.

I also need to see about getting the wood painted and the windows replaced. Anybody got a good line on this week's Powerball numbers?

by av .

I use ServiceMagic.com. I was pretty happy with the contractor I found. You have four chimneys? Wow, Nick, does that mean you have 4 fireplaces? At least you can get some money to replace the roof from the insurance. We just got done putting gutter helmets on our existing gutters and even that cost $3000. My house is just a small Cape Cod. Any home improvement costs a bundle.

I had my roof done about 15 years ago and it's never leaked (knock on wood). We were lucky that we didn't have any rotted wood to replace, so they were just able to rip off the existing roof shingles and replace them. I hope it goes that way for you too, though you never know what they will find when they get rid of the shingles.

I think getting new windows was one of the best things we ever did. We had old wood windows, circa 1950. We bought Low-E3 double-hung windows a few years ago and they are just great. They're so easy to keep clean. Now if I only can keep the birds from flying into them. :0

I gave up on painting the wood and got the house sided. It all costs a small fortune, so I hope you're feeling lucky.

AV

by nicknielsen

Two chimneys to nowhere.

Big fireplace in the living room. No damper, just glass doors to keep the aminals (and cold) out.
Two back-to-back coal fireplaces in the bedrooms share a chimney.
One chimney between the kitchen and the hallway used to be (I think) for the kitchen stove.
One chimney between the pantry and bathroom used to be for the furnace.

I'm hoping they don't find any significant rot. The house is about 80 years old and all the wood is custom cuts. The roof decking is board, not plywood, so there's some hope there.

The house is brick. The wood that needs work is the fascia & sofits, and around the windows. Unfortunately, there are a few areas that are shedding paint. :_|

by av .

A nice deep sink is a pleasure. I was amazed at how much money a kitchen faucet costs. Mine has a pull-out sprayer, but when the plumber originally installed it he put it in backwards. Duh. Nothing like not checking your work.

Eating out all of the time is just an inconvenience and expensive. I'm not much of a microwave cook, so I ate a lot of rotisserie chickens and pizza that month. Thank god for takeout from the supermarket.

AV

by boxfiddler Hot topic

I should get new dishes and ship the old ones to FL. She didn't have diddly in the way of dishes, either. :D

by ansugisalas

Since the new wood will invariably be of lower quality than the old... replacing them means having to redo them in 5 to 10 years. Repairing the old is cheaper, and lasts longer. Just need to repaint every 5-10 years.

by nicknielsen

Probably by the previous owner. I don't want to replace all of them. Most of them have storm window/screen assemblies on the outside, so it's not a problem. But I have one room on the south side of the house that is single glazed, with jalousie windows. Three years ago, the neighbors cut down the tree that shaded that room; temps in that room now routinely exceed 80-85, even with air conditioning. And, of course, in winter, the windows shed heat! :|

I want to put in a double-glazed picture window so I can watch the neighbor's garage sit there. :p

by ansugisalas

They don't have the patience to grow the trees slow anymore... and they certainly don't have time to store the raw planks until they've settled after cutting, either.

On the other hand, close to here a guy was gonna cut some weak growth forest to make heating pellets... but when he cut a puny little pine he noticed that there were quite a lot of rings in the stump...
he counted two hundred! So instead of cutting it all up he applied to give it national park protection... it gives him a tiny yearly dividend on the land, but mostly he thought those trees had earned it for hanging on that long in a place that obviously didn't agree with them :D
I guess that would have made good planks, but I'm glad he got that idea... it's kind of a rarity to see that kind of respect for nature winning over monetary concerns.

by gsg

I wanted some cabinets in my laundry room. We took several measurements, I bought unfinished cabinets, and my dad finished them for me, and cut them to fit. We went to hang them, and the walls at the back of the cabinet were 1/2 inch narrower than at the front of the cabinet. A cabinet isn't that deep, so tell me how there can be that much of a discrepancy.

Well, we finally got those cabinets to fit. The good news is that they were wedged in so tight, that no one needed to hold them up while they were screwed in. I figure that the laundry room might be the safest room in the house.

The whole house is like this. There's not a door that can hang straight, or a straight line anywhere in the house. It makes home improvement "interesting".

Oh, and the fuse box was mislabeled. Who knew that if you flipped the breaker labeled "Kitchen" and the one labeled "Kitchen GFCI" that you wouldn't actually turn off the GFCI ciruit to the kitchen? Luckily, it was only my thumb that got electrocuted. I ended up having to turn off electricity to the whole house to change that outlet.

I also found that electrocution causes me to curse like a sailor at top volume.

by cmiller5400

Sad part is you shouldn't have felt much with a correctly installed GFCI, it should have tripped nearly immediately.

I'm pretty sure when I was younger that I was hit with 220 (unplugging an electric dryer), Not a pretty sight. Talk about cursing.

by ansugisalas

And best if its a real nazi inspecting it... that's a place where you want all errors found.
One bad error, which is hard to detect, is where the grounding for the house doesn't work... meaning that the current bleeds to ground... any which way it can find. It can electrocute a person or start fires, all because of a break in one wire. If you get a shock off the casing of an appliance, that can be one cause. Also can make lights flicker.

by nicknielsen

in the house I grew up in.

My mother had the bathroom remodeled. When they went to install the GFCI outlets, they would trip as soon as power was applied and would not reset. The electrician went out to the ground, grabbed the connection to make sure it was tight and pulled the bottom six inches of an 18-inch long copper rod out of the ground. (No, it wasn't corroded!) He replaced it with an 8-foot rod.

Our stove and dryer were gas, and the furnace blower was 120, so it had never been a problem.

by robo_dev

As they had a rule about cutting the grass on the tree-lawn. His house was a very modern mansion set on a wooded lot that had no lawn...he did not even own a mower.

He would mulch the tree lawn, but weeds would grow, and he would cut back the weeds (albeit infrequently) the association would file a complaint, over and over....

So what he did was petition the state of Ohio to obtain bird sanctuary status. He was granted that status after showing the number of trees and types of birds nesting there. Bird sanctuary status exempted him from the lawn-care ordinance and he also would get free seedlings and brochures from the state from time to time. :)

by boxfiddler Hot topic

"Yesterday's installation of a replacement counter looks to all intents and appearances as though the original piece, which was 1/4" too short on one end was cut square to the too short end. The edge is also not the same as the edge on the rest of the counter tops in my new kitchen. It's freaking flatter at one end than the other. The overhang is 1/4" shorter than the rest of the counter overhang.

It's STILL a bad cut. As ****** ****** appears to have deliberately screwed me, here's what I'm going to do.

1) I'm going to report this to the BBB.

2) I'm going to report this to the Consumer Affairs departments of my local news channels.

3) I'm going to report this to as many Consumer Affairs agencies as possible.

4) I'm going to report this on the Consumer advocate pages at FaceBook (there are several dozen that are easily found, and now subscribed to by me).

5) I'm going to report this on Google+.

6) I'm going to write a scathing review to post at the Google Search result/map page that comes up when searching for ****** ****** using Google. I'm going to plaster this bullshit all over the Internet.

7) I'm going to report this to every single person I can think of that is in the construction and remodeling industry and ask them to spread the word.

8) I'm going to report this to *******, with the suggestion that ****** ****** makes ******* look bad because ****** ****** prefers screwing the consumer to doing a job correctly.

My carpenter was here when the templates for the counter were made, and assures me the templates were correct. ****** ****** has now dropped the ball twice. I did not pay $4000+ for crapass counters.

My crapass purchase was made via ******** ****, **** *****, if you need that information for some reason.

My campaign begins Friday morning. If ****** ****** would like to stave it off, I can be reached at ***-***-****. I suggest whoever lays down the law over there call me. I'm tired of dealing with installers/supervisors that think I'm an idiot.

It didn't take me this long to notice it. It did take me this long to determine what I'm going to do about it.

Mad as hell."

by hal 9000

Of course I'm betting it the same one back and I would refuse to accept it just send it back to them again but place a mark on the bottom of it or somewhere else out of sight so you know it next time you see it. ;)

Col

by hal 9000

Ask them to send the Templates to confirm that they actually fit the Top.

I'm betting that they can't.

Either they lost a bit of it or they messed it up. ;)

Col

by boxfiddler Hot topic

when the Kitchen Manager came out the day after they received the above, he said he was going to make a new template. :|

by boxfiddler Hot topic

Holiday Kitchens cannot get two same-sized doors in a cabinet for the life of them. Having gone with Euro style cabinets, this is painfully obvious without having to measure. Also, some of these doors look like what I can only call 'glorified flooring'. I'm getting a real load of crap from the cabinet guy when I bitch about it.

I chose hickory, as once properly cured it's virtually indestructible and warp-free.

Load #1. (said to me whilst we were standing on a freshly sanded, unfinished wood floor in which, for sure, you could tell what color the various grain was). "You can't tell what color the wood is after sanding." Mmmm hmmm.

Load #2. Hickory is a high moisture content wood, so it shrinks and warps easily. This is true while curing (drying), but once cured, not so. Which is why it's prized for floors, cabinets, counters, butcher blocks.

So, HK. Stop trying to work green freakin' hickory. Idiots.

Would it surprise you to know there's another letter in the works?

by hal 9000

Are you enjoying your [b]Education Experience?[/b]

Sounds as if you are having no end of fun and why would you want dried and cured wood it's much better being green and ideally with the tree remaining uncut. ;)

The crowd you are dealing with make Ikea sound like a High End Professional Crowd. Now if only you had a Allen Key. :D

Col

This discussion is closed to new replies.