9 replies
by turambar386
by dbarker
Gerardo, this is a question best answered by a consultant. There is not enough room here.
The best way to start is to determine what equipment you will need to meet the requirements of the data center. This will give you the electrical requirements and required floor space and help determining a floor plan.
The center should be in a secure building not prone to flooding or fires, have a good fire extinquisher system that does not hurt equipment (no water!) and most important a backup power system.
Last but not least - always plan for expansion.
by realgem
The previous post is good (certainly better than the first one). But you should also consider what your needs are.
Things like the number of staff required to meet client needs, growth projections, etc. should be driving your floor plans, etc. Also don't forget about building codes. I agree with the previous post that you should get professional advice (architect/designer/engineer).
by realgem
This discussion is closed to new replies.
Trending IT Employment posts