Discussion Locked

company moving to new location

0 helpful
9 replies
Closed to new repliesThis discussion is closed. It stays readable, but it takes no new replies.

we are moving to a new location and I would like to know if there is a site where I will be able to retrieve a check off list of things that must be done and checked out before we make the move. We are presently using Win NT and migrating to Win 2000 within the next month. We were asked to make a priority list. We are using Cat 5 wiring.

Any information will be helpful.

thanks,
Cheryl McCoy
cmccoy@nyts.edu

9 replies

by ebob

Checklists like this really need to be made by you.

The first thing on YOUR list should be:

1 - DO NO MIGRATE TO WIN2K and MOVE AT THE SAME TIME! (One headache at a time, please!)

The second item on your checklist should be:

2 - NO NEW DEVELOPMENT, NO MODIFICATIONS TO EXISTING SERVICES AND SYSTEMS! (See #1!)

To complete the list, go around your current location and see what SERVICES you provide your users, and what TECHNOLOGIES support these services. Then go back and take a detailed inventory.

Make special notes about "custom requirements".

You will need to use the SERVICES to prioritise what you setup in the new place. Your WAN and/or Internet connections should be ready and live in the new place before you move in.As should your new cabling, patch panel, and the new switch you've always wanted and managed to sneak into the "move budget". Move a couple of the nerds over and use them (yourself?) as guinea pigs.

Then you can start dragging your users over.

by shmaltz

Follow answer no 1. Plus draw on paper an exact plan on how you are going to move all the computers. If you have to make sure which computer goes where ask from the Building Management department a map of the building. Lable each computer before they take it out so you know which computer is which. Make a map for each computer where it goes. Make sure that you have enough CAT 5 lines for when you move, PLUS an easy way to run new lines or extra lines in each room (it pays well in the long run, you know how it goes: "we need an extra color printer for that project and every one has to be able to print from it").
On the move process set up some computer once you have the servers set up and try to connect (hey dont forget to connect with an account that dosn't have administrative rights), make sure they connect like there wasnt any move going on.

by otl

The above are great, additionally;

Rule of thumb, for every 10 feet of wall space (usually near a power outlet) install a telephone and computer jack each numbered accordingly. Having too many jacks more than makes up later when you rearrange the office and need a tech to come back and install another.

BTW - I hate to go into an operational office to install a jack on the far end of the room, while people are trying to work. This is much easier and quicker in a empty room!

by wlbowers

The other answers are good.
Either obtain plans for the new location or
draw a layout.
Establish location of servers, network
printers, hubs, switches, routers, and
client computers. Label all equipment as
to where it goes and label the drawing. {A
sharpie on the back or bottom}
Prewire facilities for network and sweep
the cable for intergity. {this will save
headaches during and after the move}.
You do not need to be checking cable and
jacks.
Verify the ac circuit requirements of the
servers and have an electrician install
dedicated circuits. {Don't do the any old
ac outlet will do mistake}
Perform a master backup before you
move the server one inch. Take this
backup offsite. {You will not believe whatcan happen.}

The network should be extablished first.
Hubs and switches in place and cabled.
The server should be poot in place next.
Then the client machines and printers.

This discussion is closed to new replies.