Discussion Locked

Copy DB for editing, is this bad?

0 helpful
5 replies
Closed to new repliesThis discussion is closed. It stays readable, but it takes no new replies.

I make a copy of the front & back end of my DB on a zip disk, I then take it home do a relink of tables, and design or modify forms etc. as needed. When I return to work I import the forms queries etc. that I made changes to or designed into the original DB. It seems that shortly after I do this my original DB has problems that can't be resolved, and sometimes it's with forms that I haven't made changes to. ie: one form works for all except on machine, or form that wasn't edited now gets errors that "Operation not supported in transactions"
Does anyone have problems like this? I sure don't want to give up being able to work from home, but I can't keep rolling back the DB and spending hours trying to fix these problems.

5 replies

by mservino

My first question to you is what platforms are you using. What is the front-end, and what is the back? PowerBuilder-SQL Server?
VB-Access? CICS-DB2?

It's tough to tell you what the problem could be without knowing what your working with.

by ra_tevis

I am using Access 97, and both end of the system are being stored on a NT 4.0 server. The office has about 6 users. We have seperated the data from the form, queries etc. There are many times that I have made changes in the copy that I take home and then export them into the DB with no problems, I haven't been able to pinpoint why I keep getting the unusual errors. I also run Access 97 on my machine at home.

by mservino

do something similar with a program for my girlfiends daughter. It uses an Access 97 DB on the backend with a VB front. I bring down the database once a month or so, massage the data, do some clean-up run a few queries, validate the stuff and send it back, I leave the queries in there and no harm no foul. the program never even bats an eye at it.

If I make changes to the queries on my copy, what I do is rather than import them I delete them and then do a copy and paste into the Production DB, without incident.

The only things I can see that are different are that you are doing it as an import of the design elements. I work with a strait copy of the DBs and treat them as if I were copying from same to same, takes a little more work but no problems.

-Mike

by ra_tevis

Just to verify your reply, instead of doing an import say of a form, report, query. You copy the changed document in the copyied DB and then do a paste in the original DB?
Thanks for your replies, I will sign off on this question with your reply.

This discussion is closed to new replies.