3 replies
by rbgnr111
just create 2 ncf files, in them have one unload the nlm that runs the sql server, or if there is a command like stopsql.ncf tell it to run that, in the startup one for when the backup is done enter in the command used to start the sql server.
in arcserve if you go to the tools ( I think) there are options that allow you to specify a script to run before and after the backup runs, just enter the appropriate script in there and you should be able to do this.
by laltman
You have to modify one of your .ncf files in order to perform the delete function
Rem Ncf delete starts
Load netbasic.nlm
shell.nlm
REM== once here, type like a DOS command box
cd \arcserve
attrib -r file.log
exit
REM == Exit the DOS way, back into nlm side
Load_databse.nlm
REM Finish!
Both .ncf that you have made, must be referenced into your backup job just to let arcserve unload the database prior to a backup , then rename and delete that log, and the load the database again.
Consider also buying an Arcserve agent to hot backup your database !!!
This discussion is closed to new replies.
Trending Networks posts
Sort by Trending