As our summers are you're winters and vice versa. Currently Solar is growing in strength over here as the cost of connecting a properitey out of town is prohibitive and then onvce connected you are on a garantied mininum power consumption which you pay for no matter how little power that you may actually us. So Solar got a big shot in the arm here because it works out cheaper than connecting to the mains.
There are several alternatives that I've seen used in the country areas with something as simple as a solar panel driving a water pump for stock water and no batteries involved so it only pumps durring daylight hours and then more efficently when the sun is high rather than in the early morning or late afternoon.
However BP has gone int the Solar thing in a very big way and for as little as $30,000 AU it is possible to provide enough solar collectors and storage to run the farm house with lots left in reserve. Now this might sound expensive at first but when you consider that it may cost anything up to $500,000 AU to connect to the mains and then you have a $400.00 AU per quarter bill it is a very cheap alternative.
There are two aqua farms in South Australia which have chosen to go this way just for simpilicy and cost factors. One in particular was quoted somewhere near !.5 Million Dollars AU just to be connected to the mains and then have a $30,000 AU Quarter bill as well as being responsible for the overhead wires so if they where brought down they would have to pay for their repair from the Electricity supply board as it is all high Voltage stuff and not the low voltage that normal sparkies can work on. It cost them $850,000 Au to install the solar array and there are few ongoing costs involved so they are far out in front from the begining.
Currently the Solar Power industry is fairly big here in Australia and with the current products available {even Tandy sell some of this stuff although it is from the basic end of the market} there are numerious places which are solar power only as well as out telacomunication company who has small transciever stations all around the country being powered soley by solar installations.
Now with this in mind I took a look intothe feasibility of incorporating a Solar array into our current DR systems and this was brought home this last week because of what where described as severe thunder storms leaving very large areas of Brisbane without power for anything up to 3 days and in some cases even longer.
We where in a position where we couldn't get any fuel delivered for our generator and at the same time restricted in what was available for company cars so we where somewhat limited.
I can not help but wonder just how much electricity is taken for granted and just how many people are willing to even consider a large scale long durration outage and it's consquences. Even the homes which use natural gass would be affected as electricity is required to pump this gas through the distribution grid at a sufficent preasure to be usefull to the end user. The same applies to water as at first the resoveriors would carry the load requirments but without electricity to refill these stations there would be a rapid decrease in both water preasure and quality.
Now whith the above in mind I did some investigation on what would be required to have a solar installation that was at least equial to our current diesel system which is sufficent to run the computers and lighting but not much of the other buildings requirments like lifts and AC.
Our current Diesel system is nearing the end of its useful life and will soon require replacing and then there are the constant maintance requirments that are involved as well as the cost of fuel and storing a sufficent quantie to fill our needs for at least 1 week. this will require new fuel tanks and a complete new installation to be installed as well as some form of pumping station to raise the fuel from the underground tanks to the generators so it can be used. Overall it is a very large item in both space and money involved. We are also having a problem of water contamination of the fuel so new underground tanks are a first requirment.
Our current system supplies 15 KVA and is capable of running our computers and lighting as well as security, fire alarm and fire suspresion systems. We have been given an estimation of a 6 month requirment to replace the entire unit and all the associated components.
Not a very effective way of having a decent DR plan in place while this work is being performed and while we could be lucky and not require any of this while the work is being performed I for one am not willing to stake my life on this happening. Currently the diesel keeps stopping owing to fuel contamination by water or more precisely starts running roughly as well as a loss of effeciency and once stoped requires a lot of mantance time to get running again.
Now the Solar installation that we have been quoted on is about 3/4 of the price of a new diesel system will require about 60 square meters of solar pannels on the roof facing north and the storage batteries and inverteres will fit into a Seacontainer with the added advantage of installation time being something like 8 weeks with no disruption to our current existing system. The time delay and inconvenience has been the main factor in nothing being done to correct the existing problems.
There is also the added advantage of all the Solar arrays being low voltage so no special wiring is required and the only specalised equipment necessary is the frame that the solar pannels will sit on which has to be designed to suit our current building.
On the up side other than the ocasional clean of the solar pannels and an occasional look see that there is no corrosion forming on any of the battery terminals it is virtually maintance free and with the charge limiters the battery banks can never be overcharged so the batteries should have a mininum life of somewhere between 6 - 8 years before any replacment may be required. There is also a redundant system built in for any batteries tha may fail and everything in this area to the invereters is only 12 volt DC so it is as safe as possible.
The inverteres are to be mounted high up on the inside of the container and feed directly into the existing power grid and become active in exactly the same way as the old diesel system did so there should be no problems there the equipment required is nothing new and has all been tried and proven over many years as it isolates the building from the mains when the incoming voltage drops below a certian predetirmined level and will swithc back to the mains when the voltage rised above a set level. All pretty standard stuff for any emergency power plant with the exception of other than the actual switches involved there are no moving parts involved in the entire system.
I then asked just how reliable this form of installation would be and was supprised to find out that what we required was nothing more than a bigger version of a domestic solar power plant which this company was already delivering Australia wide but mainly to outback areas for the above mentioned reasons about the costs involved in connecting to the mains. They have been selling these units for 15 years now and while there have been improvments in both the Solar collectors and storage batteries the idea remains basicly the same with the added advantage of no recuring costs involved once the installation is setup. There is no fuel required and other than the occasional check up that only requires someone looking at a pannel of lights to tell you if anything has gone astray like a faulty battey or failed solar charger or whatever all of which is displayed on a pannel on the outside of the container in a conventional fuse box type arragment. Tis display pannel monitors everything from the incoming feed to the working of the inverters and displays any malfuctions.
Then there is the fact that the Solar collectors are almost indestructible in normal use and they carry a Life time warrantie so unless a plane or something similar falls on them thay should remain functioning and because of their position they are unlikely to suffer any accidential damage as they are in a place where any heavy equipment just can not reach like you can not accidently back a car over them unless you first get a crane in to lift the car up to the top of the building and then attempt to drive it around up there. The batteries are jell filled sealed items and have a proven track record and other than the actual charge controllers and inverters which are all solid state these should remain working long after this installation has been written off as a tax deduction and depreciated to zero cost.
Now the reasoning behind all of this was to increase our available power which will be about double our present capacity no interference while installing and minimal costs involved in running & mantainance.
The initial costs will be about 3/4 of the replacment cost of the diesel unit and associated components no interference to the work place or at best minimal interferance, virtually no maintance or running costs involved once setup, and a small setup time involved.
We already use the standard home installations on our remote sites for backup power and while they are still realitively new as they have only been in place for about 3 years they have so far proved trouble free. I feel certian that this conversion will prove a smoth transisition and far more importantly far more cost effective that our present alternative which showed it's very weekness last week when we started to run low on available fuel and that was only after about a 2 days of off and on power than 3 days without any mains power at all. While we managed to keep the core network running the units on the prefifery had to be turned off to save available fuel and this did adversly impact on our ability to perform business but at least we where still fuctional which is a lot better than can be said about some of our competitors.
In the regional sites the Solar Installations have already paid for themselves and so far have proved to be a very sucessful altenative to costly diesel generated power and with the added advantage that a diesel mechanic isn't required to be on site or on call 24/7. We have had these Solar Arrays pounded by hail stones up to golf ball size {and bigger} without any problems other than the bending of some solar cells which in no way impacts on their function. Covered by dust storms and in the last few weeks flooded and the units just go in working without any problems. Although if one of these units was submerged under 10 feet or more of water for several weeks I'm sure that there would be some maintance required but soi far other than hosing out all the mud that was washed into the containers that has been the linit of any required maintance.