Due to a transformaer change next summer our IT department will be without power for approx. 2 weeks.

This is to long for us to be down so we are considering a generator to be connected and supply power through this.

The generated power will be running not only server access within the department but our WAN ethernet connections as well.

My concern is with timing of the ethernet. Our remote sites will be on local utility power while we are on the generator. Will our ethernet connectivity be affected by this? Are we going to run into a timing issue because of this? Any information would be appreciated.

Regards;

Jeff

8 replies

by stillatit

It should not be a problem, since, if you think about it, most or all of your electronic components actually run on DC.

Hopefully your servers are each sitting on a UPS in any case, and it is the UPS which will get the generator power and smoothing it out. If they are not, you might strongly consider a small UPS for each server. Even if you pick one with only about ten minutes of reserve power, you will have smoother power.

Good luck.

by jeff in alberta

Thanks for your comments. I understand that all the gear does run from DC power, but I was under the impression that at some point a timing signal has to be produced and I thought that was derived as a component of the power supply and line frequecy. I could be wrong but wanted to confirm or refute this.

Our servers do run on UPS's which has saved us in the past as the power here tends to be a bit dirty anyway.

Thanks again.

by tbradley

I hate to be the harbinger of bad news, but when you go to the generator scenario, you are susceptible to power sags, spikes, surges, harmonics, noise, etc etc.

Power from a generator is notorious for being "dirty", especially if the generator is un-tended, and I don't think you want to be bringing down your data center each night, and bringing it back up each morning.

You need to investigate and invest in a top of the line power conditioner that can handle all the problems I mentioned above. A simple UPS will not protect you, as the simple ones are no better than a power strip attached to a battery. What most people don't realize is that you do not draw power constantly from the ups, you draw power from the line, and only switch to battery upon a power failure.

The only good thing is now you can justify the cost of the Power Conditioner, which every data center should have anyway. It will not only protect you while on generator, you get it's advantages after the changeover

by tbradley

forgot to mention, you need to consider having a separate generator for your data center, as building usage climbs and drops during the day. Your equipment will "always" be on, so a total power requirement can be calculated, and keep it isolated from the nasty culprits that dirty up building power like fans, laser printers, copy machines etc.

by jeff in alberta

Thanks for your comments. I will be working with our resident master electrician on this. We will be making sure, or as close as we can, that the power is of sufficient quality to run the equipment.

It is my understanding that only the IS department will have the generated power during this outage. This has yet to be determined.

by Former member

We've used power generators before (big ones), no problem. Although a UPS would be nice to be on the safe side. ANd then if you do have UPS's they will tell you how dirty or varying the power is by their activity (clicking on all of the time...etc.)