17 replies
by radobson
In my current work environment we have very stringent requirements on ceritifcation of new technologies. These requirements are driven by the customer and non-negotiable. Its like humidity. Its just there.
Frequently technologists here, given a problem, look to vendors for ideas on how to solve the problem. All well and good, except that the vendors INVARIABLY drive our technologists to newer versions, which are frequently not certified for our network. The certification lag is routinely 18 months. Again we have no ability to effect that.
The problem we enoucnter is that developers generally want to use the newest technologies, generally for excellent technical reasons. The fact that these technologies are not available in our environment generally doesn't faze them.
This year we encountered a cost reduction project which was designed to shave $1 million a month off of our costs. The development team chose to use Windows 2003 for IIS 6.0, even though nothing in the technical solution required it and the proof of concept was done on W2K / IIS 5.0. After four months of development the customer has rejected the request to release to production because W2003 has not yet been certified. That process has 6 months or more to run. The net cost of the decision to IIS to my employer will probably be $10 million in 2005.
The technical recommendation was correct and accurate, but the business decision was wrong.
by radobson
With dwindling IT budgets, stiff and increasingly skilled off shore competition, what is an IT professional to do to maintain the illusion of job security?
The answers seems to be similiar to investment advice. If you don't know an insider who will whisper the 21st Century equivalent of "Plastics" then you should consider diversification.
The team that I work on has about 8 people. 5 of these are "Oracle DBAs" or "Oracle Engineers". For the most part they are technically competent and able to contribute to solving Oracle problems. The other three are uber-Geek wonk-heads who treat each new request to work in a new product/environment/area a wonderful opportunity to learn. Intrestingly enough, both groups will consult the same books, websites and vendor resources to solve Oracle problems.
The uber-Geeks will apply the enthusiasm and desire to SQL Server, MySQL, Sybase, or flat file conversions for that matter. In the inevitable contractions in the workforce it appears clear that those folks with
1. A diverse skillset.
2. A yearning for new knowledge.
3 A passion for IT technologies in general
will thrive. The one-trick ponies (no matter the pony) will be eventually left standing when some music stops. And no, product upgrades DO NOT represent diversity.
So, just like your 401k, diversify your skill set. LEARN that new product. In all likelihood that will be ticket to keeping a good job or finding a better one.
by dc guy
Most people, even computer/network/software engineers, do not have the aptitude, the energy, or in many cases even the interest, to put so much of themselves into their jobs. After all, people also have other commitments, including the increasingly neglected areas of family, relaxation, exercise, hobbies, and entertainment, all of which contribute to our health and longevity. According to the anecdotal evidence on TR, the average work week for IT people has stretched far beyond the current national average of 50 hours and we all know how difficult it is to get one's boss to allocate time and money for professional advancement. People are working this long and this hard just to keep up with their top priorities and avoid being fired. Where is the time supposed to come from for these career-advancing tactics?
What you're saying is that IT jobs are increasingly being awarded only to the exceptional people who require less sleep than the rest of us, or to the one-percenters who are willing to forgo marriage, children, slow food, physical activity, and non-business related reading.
In other words, IT jobs will soon be available only to a small fraction of the number of Americans who now have them.
by duckdive1
I agree. A good employee, consultant or vendor, whether in IT or any other field, approaches their job with passion. I have come across some people in the IT field that really don't seem to enjoy it nor do they attempt to advance their knowledge. Having worked in IT for 10 years, I'm constantly challenged and have to adapt to new technology, environments, and problems. I thrive under pressure and look forward to change. The best IT people I know do not work the hardest or longest hours. Instead they are good at what they do. As an owner of an IT support firm, my biggest challenge is finding employees that have the same outlook and passion.
John Olinger
DELTYME - http://www.deltyme.com
I just so happen to be one of those "uber-Geeks". I must admit my husband cooks and cleans and my children do not get as much time as they should but somehow I stay above the curve and remain super passionate about my job and IT technologies. I multi-task as much as possible - such as bike riding with my kids to soccer practice, running while I listen to an mp3 of a recent webcast, or taking my SMS 2003 book with me to baseball practice. Still I have to admit it is getting increasingly hard to keep the "uber-Geek" title and the pay-off is starting to dwindle.
Fear certainly motives many to learn new skill sets. Fear of loss of
lifestyle, position, home. etc. does play a role, but for many the love
of being on the cutting edge of technology seems to be the driving
force. If you do not keep up your skill set by staying up to date
and adding new items you will find yourself greeting at Wal-Mart
instead of staying or being employed in IT.
by tekwallah
When the layoffs started in earnest after Y2K, the common wisdom was that keeping your technical skills up to date was the secret to long employment. The Java programmers were smirking. And it?s true that early layoffs targeted people who had been coasting for years.
Then we laid off all the Java programmers.
If no-one has more than months? experience in a field, because it?s so new, then you have no advantage over the cheapest worker out there. At best, you?ll never see another pay raise. Skills such as SMS 2003 fit into that category.
The people who have a modicum of job security not only have a breadth and depth of knowledge that can only be acquired by a long history of learning, but are also intelligent and hard-working. Most importantly, they also have ancillary skills such as an understanding of the market, complete native fluency in written and spoken English, and/or the ability to quickly develop rapport with internal and external customers (the executives who authorize purchases).
Like dinosaurs, once the current generation of ?bergeeks has disappeared, their like will not be seen again. There is no longer anything in the field of IT to attract such people with such potential.
by radobson
Scenario: You have just been given the opportunity to lead a team of technical professionals who have designed, built and operated a critical support system which, by all accounts, is under performing everyone's expectations. The team is located in three geographical areas. One does engineering (think new products, patches, upgrades) and the other two do operations.
90% of the team has been on the project for 4 years. Last year the engineers spent 1.5 man years "engineering" a product (version) upgrade for 12 instances. All of the instances failed to upgrade during the scheduled maintenance windows. The failures were related to things like missing installers, low disk space and missing patches.
Your mission: Transform the team from "the gang that couldn't shoot straight" to "database delta force"
The constraints: You have 8 people on the team. You can only grow to 10. It takes 6 weeks to get a new hire into the environment and work (the job requires a security clearance). The corporate culture will only allow raises of about 5% a year.
What we did was get everyone together. Let them vent for a day and then explained the new vision. We didn't dwell on the mistakes of the past, but rather looked forward to the future. We explained the standards that we need to be met and gave everyone ample opportunities to meet them. In fact, the standards weren't all that high. The engineers had to engineer for the production environment and the production operators had to document all changes in the enterprise Change Management system (Remedy).
At six months into the exercise here's where we are
Team strength - 7: We lost two senior operators who didn't want to adapt. We let go one sub contractor who couldn't meet dealines. We gained an internal transfer and 1 outside new hire.
Performance - Overall the teams' performance is about like it was before, but at almost 20% less cost. And with the new hires we are poised to make some improvements.
The basic methodology has been to document (primarily in focused emails) the work standards, and the follow up, follow up, follow up.
I would rate our success at about a B for the first 6 months.
Despite the cost-cutting issue, I hardly call that a success, because:
- Sometimes 20% can be little money as a matter of fact; so, for a company, that 20% is really nothing.
- Just "fishing" for hiring some appropriate guys usually fails to lead to a solid result.
- All the people I know got used with any work-conditions or payments within 3-4 month (both rewards and penalties).
- There is no consistent plan for emproving the team-work; just hiring and firing ballance is not doing the job - trust me.
Perhaps you should try a team-building specialised training - ask the
Human Resources Department about that. I know that there are
specialised firms that deal with team-building and the effort pays off
eventually. Remember that solid results comes in due time (no patience
is no result)
I suggest you try the team-building training!
by hellums
First of all, it's not an "exercise." You said specifically it was a "critical support system." How you look at it is as critical.
Losing two senior operators because they wouldn't adapt. Could be true, I don't know. But what's their side of the story? They were senior for a reason--they've got the job done, and have a lot of corporate knowledge (presumably). Are you 100% sure you're not leading them in the wrong direction? Did you listen to their complaints and give credence to them, look for solutions, work to help them, etc.? How did the rest of the team feel about their loss (devastated, relieved, worried, angry)? If they left because you (or company management) were wrong in approaching the problem and solution, then they'll get the last laugh, and you may be next on the chopping block. Be objective.
Likewise with the contractor. I'd like to hear their version. Did they just suck and not meet deadlines, or were they given unrealistic deadlines and do their best to achieve them, unsuccessfully (as should have been expected)? Were they given good requirements and the necessary level of project support and coordination?
It's maybe telling that you said you let them vent and then "explained the new vision." Eureka! In these instances you have to realize they were a team under someone else before you lit up the scene, and they'll still be together after you're gone, under some new manager. I know I wouldn't like a new guy that accepted an "opportunity" to lead the team just stepping in and with less than a day's discussion told us how it's going to be done now. Personally, I'd like to see my new manager come in and talk to us individually first, then in small teams (operators, engineers), then as a total group, preferably with a facilitator and note-taker. Once I know the manager has a good appreciation of the TEAM's operational perspective (rather than just senior management's) of the project, then I can accept that they're making good decisions and giving good direction. Lacking that, I'm distrustful from the start. No buy-in, no motivation, no teamwork, etc.
What was the motivation of the transfer? Was there a promotion in it for him/her? Adding some extra experience to the resume? Why would they jump on a failed project with senior engineers jumping ship? Determining their motivation will let you know how valuable their addition will be (or hindrance) to the project. Out with the old and in with the new may not poise you for improvements as much as you'd think.
A raise shouldn't be based on longevity and the cost of living--it should be based on performance and results.
12 instances and they all failed on installation of the production environment. This indicates poor project management and adherence to even the most elementary systems engineering process to me. There should be a good test environment and a sufficient testing process and phase to know for a fact these upgardes will work long before you actually walk into a "critical" system and VERIFY that stuff doesn't work. If they didn't know it didn't work before thise "window" then shame on them. If they knew it didn't work and didn't get the operational test pushed back, shame on them. And quite honestly, 12 out of 12 instances failed? Not even 1 passed? Shame on them. The problems are obviously bigger than any solution posed by throwing people and raises at them. I suspect several of them lack some of the necessary skills to get the job done. Get them some training. They are probably also lacking adequate tools. Get them the tools they need, and training to go with it. They may be lacking support--show them support as well as direction.
by ljgizinski
"Team strength = 7" - Team strength isn't the number of people on the team, it's the technical skills (I use "technical" broadly, including such things as negotiation), motivation, etc. Personally, I'd rather have a small team of truly dedicated people working on a critical project than 30 who don't care.
"12 for 12" - One poster already pointed this out ( due credit), but what's the morale of the team? Is the company in transition? Are they all concerned for their jobs? Is the project related to a merge transition, after which they won't be coming back?
"Overall the teams' performance is about like it was before, but at almost 20% less cost." Say my kids were going to school A and failed 12 out of 12 tests. We relocate and my kids are now going to school B. Their grades remain the same, but the tax rate for that school district is 20% less. Is that success?
I'm not trying to be hard, but I think you need to revise/create a long-term project plan so you can better see where you need to go. Looking for a quick turnaround on the performance of a 4-year history may be a little premature. I DO commend you on your allowing them to vent, as long as you were taking notes on what they were saying.
I wish you well in this.
by cedric.tanga
I liked the approach you took.
Something had to change and it's putting a stake in the ground and saying, " ... from this point on this is what we can do ...." the emphasis is on "can" You can have the most skilled, degreed people working for you yet, if they are not working "with" you then your "team" is not a team. It soon highlights where the shortfalls are and who is & isn't a team player. To support your stand, less staff with no loss of support indicates a spring board for growth & opportunity with your greatest support method, follow up, follow up, follow up!
I'm sure your next 6 months will show significant professional team development with more of diverse skills where they will be able to leap frog and pre-empt challenges rather than be overwhelmed by them.
by radobson
Been there, done that?
Its 2 AM. The business critical database has been down for 8 hours. Your team is fading fast. The vendor is in a "post your problem to our website, we'll post a solution back" mode? What are your options?
First - if you're asking that question at 2 AM you're already hosed.
Critical incident management, or whatever phrase you use, is not something that you can invent on the fly. There are well known patterns and practices for incident resolution. ITIL is an up and coming collection of best practices and provides a library of ideas. Its a good starting point for know what you SHOULD do.
The HOW you do those things are up to you.
Like most important things, the time to start critical incident management is well before the outage. You should have a core of people who are trained in how your organization manages critical incidents. This team should be able to support 24x7 management of critical incidents for up to 3 - 4 days. The number of teams you need will be determined by how large your enterprise is.
The primary talents team members need is the ability to create and maintain an accurate picture of the situation and the ability to keep a diverse team focused on specific actions. Your incident managers (IM) do not need to be deep technical experts, but they MUST be familiar with the technology and the environment.
Where can you find IMs? The IM factory is the United States military. Find a senior NCO or mid-level officer who has stood watch in a TOC during a battle (real or simulated). These individuals are adept at managing multiple things and disciplined enough to keep good notes.
With respect to the notes, this is a key element. A major incident will involve one or more vendors. The vendors will have varying degrees of commitent to resolving the incident. It seems like their first priority is to blame any technology that is not their own. The notes will become critical as the vendors and your IM team go through shift change.
The notes aren't novellas, or event blogs. They are log entries. Date/Time (including time zone), and a brief note. Most of the notes should be in form of action items. Resolving the incident quickly is all about action.
An action item is something, generally a task, that has a number of properties.
1. Identifier - Every action must be uniquely identified. A numbering system like A.1, A.1.1, A.2 is common. Regardless of the system, each action MUST have a single way to reference it. Your IMs HAVe to be able to communicate in terms of "What is the status of Action Item A.1.1?" and have confidence the answer back is really about that action item.
2. Every action must have a Next Action. This should be short and defined. (restart server, restore /2a/datafile31.dbf from tape, etc) This allows for chaining of a sequence of steps to complete the action item.
3. Every action item has EXACTLY one owner. The owner is a PERSON. The owner MUST accept the action in a conversation or email with the IM. Action items CANNOT be owned by Organizations, groups or pairs (ie, Bob/Bill. Who is responsible???)
4. Every Next Action must have a date / time for status. This date / time MUST be provided by the OWNER. This is a primary component of accountability.
Following the rules for action items above will decrease the time spent on negotiating this information after deadlines are passed and opportunities missed.
IMs should collect all the action items in a single document, called an Action Plan. The Action Plan should also include a section for references (phone numbers, ticket/case numbers, etc). IMs should include relevant discussions including the date/time and noting action items which resulted from the discussion.
The Action Plan should be electronic. This will allow IMs to pass it during a shift change. You can create a web application, but a text document works ok as well.
During the incident communications are VITAL. Companies that can should stand up a conference line for the duration of the incident. This will ensure that everyone can communicate quickly and the IM can keep her finger on the pulse of the activities. This reduces the number of side bar conversations that can lead the technical team astray.
Finally, the IMs should be insistent on the technical team members completing DEFINED actions as specific TIMES. This will allow the team to continually move forward.
I'll have more suggestions for incident management as soon as I get some rest.
You see, we had a 60 hour outage in a business critical system this week. About of third of that was wasted time with the incident team spinning in circles. I was really the only IM we could find between three organizations with a total of about 60 folks.
So its been a long week.
FEMA is an excellent resource for setting up an Incident Command Systems. While most of their information is geared towards the fire service and first responders, the key ideas are the same. They even have online classrooms (http://training.fema.gov/emiweb/is/crslist.asp) you can take independent study courses on, and you receive a certificate. Here's a few that may be useful:
IS-1 Emergency Manager: An Orientation to the Position
IS-100.FW Introduction to the Incident Command System, I-100, for Federal Disaster Workers
IS-195 Basic Incident Command System
There's a lot of other good stuff, so check it out.
by radobson
So. The transformation experiment failed. I was unable to convince my manager/friend to enforce the standards required to lift the organization. We devolved, rather quickly, into the kind of organization, where a few people worked at 110% but most worked below 33%. As is inevitable, we burned out the 110% components.
The root cause is correctly put on the leadership. However that oversimplifies the issue. In fact, it was the leadership's failure to clearly communicate the gravity of the personnel resource issue early enough to prevent burn out. Even though I work in a global company with enarly 100,000 employees world wide, for the first 3 months of our efforts the only resource available to me was my Rolodex. This didn't work.
Finally, last week, after months of no change, only more work, I left the manager I had been with for 2.5 years. Now I am an individual performer, working on tools. Which is fine for me for a while.
by radobson
Here are 10 things that you should know before you starting coding....
1. Know the customer. Know why they want the product. Know what business problem it will solve. Know what external forces may cause the problem to change (regulation, executive direction, etc). Know how they will measure its value. Know how they will know if you delivered the value you committed to.
2. Know the user. The user may or may not be the customer. Users and customers have different perspective. Know how the user does the tasks today. Know what tools and technologies she employs and which one work now and which ones don't. Know how you can make her job easier and still value her contributions.
3. Know the production environment. Know what technologies are available. Know and be able to measure, the cost to implement new technologies. Know which systems are reliable and which are not. Know who can effect change in the production environment and how you can communicate with them. Know the roadmap for the production environment and align accordingly.
4. Know the development environment. Know how to access your version control system. Know how to access the defect tracking system. Ensure you have accounts in all of the systems where you will work.
5. Know the development team. If you are an individual performer, meet each team member individually. Schedule an informal phone call or drive by to their workplace. Know what technologies they are most comfortable with. Know what they want to get from this project. Be sure to include the testers / QA / project manager(s). If you are a lead, know the talents each team member has. Know what kind of learners they are (visual, auditory, tactile, etc).
6. Know the design of your solution. Know the architecture and which design patterns are involved. Know each component of the design and how they interact. Know which messages get sent and what returns are expected.
7. Know the inputs and outputs. Know how the system will recieve input and generate output. Know the interfaces for the external systems. Know the frequency for inputs and outputs. Know the permissions you will need on the output system and test them.
8. Know how to measure your solution's baseline. Know how you will measure your solution's performance. Know how to make discreet measurements for the components you build and how to isolate your system's performance from the input and output systems. Know how to measure which users use which features and how long it takes them to use those. Know how to turn this off and on as needed. Know how to analyze the data to find problems and isolate the source.
9. Know when you're done. Know what it takes to be done with the project. Know what the requirements are and how you will demonstrate each to the customer. Know how you will recieve defect feedback and know how you will deal with different kinds of defects. Know what performance measurements mean your system is working.
10. Know how to communicate. Know what the standards are communicating with the customer, the user, and the team. Know how to write grammatically correct business language. Know when, and to whom to escalate. Know how to formulate communications so that the recipient can answer "Yes" or "No". Know how to track communications for future reference. Know when a phone call or walk by is more appropriate than an email or other written communication. Know that anything you type, and some of what you say can be used against you in a court of law, design / code review, late night bug fix session, performance review, exit interview.
NOTE: For purposes of this conversation, KNOW = document. Additionally, there are references to things in this posting that many developers and teams don't do. (Such as know what design patterns are involved, etc. If you don't do that now, you should. The same goes for defect tracking)
by radobson
A colleague of mine recently forwarded a diagram that had been produced by person on the account where he now works. The purpose of the diagram was to allow the account management to show the customer how the account team planned to resolve a significant impasse in getting data from one subcontractor's system into another subcontractor's system.
The diagram had an number of nice colors, and arrows connecting the approrpriately labelled boxes in each subcontractor's domain. The only thing missing were the ports and protocols. You might think this was an oversight, however, as it turns in every case at least one subcontractor blocks a port / protocol that could be used to transfer the required data. In most cases, both sides blocked it.
At this point it became obvious to me.. what was needed a is port / protocol combination that technologists, faced with a series of non-technical roadblocks, can use to accomplish the impossible.
Hence, I am proposing the new Multi-Application Graphical Connection (MAGC) protocol and by convention we'll use port 10 (from the old joke about how many kinds of people understand binary).
HTTP blocked? No worries, use MAGC on port 10.
SMTP blocked? Never fear, your mail message will make through using MAGC.
FTP disabled? Not a problem. We'll just use MAGC to automate that file transfer.
And appropriately enough this is by far the most common protocol in business logic diagrams. Particularly those used to commit tens and even hundreds of millions of precious IT dollars.
So.. the next time you're faced with a hard deadline and the management is screaming for that connectivity.. reach into your developer bag o' tricks and pull out the Multi-Application Graphical Connection (MAGC) protocol.
This discussion is closed to new replies.