Part 1 - There is a method underlying all successful projects and if you follow this method, your project will almost certainly succeed. That method is Structured Project Management.
Structured Project Management has the same relationship to conventional project management that structural analysis and design has to conventional analysis and design i.e. it replaces a highly individualised process with one that is standard, repeatable, predictable and consistent.
Structured Project Management's Ten Steps are divided into two sets of five. The first five are to do with planning the project, the second five with implementing the plan. There is a loop in the Ten Steps causing the first eight of them to be repeated. Thus the project proceeds in a series of 'plan then do'steps.
PLANNING THE PROJECT
1 Visualise what the goal is: set your eyes on the prize. This can be achieved in many ways, ie getting your stakeholders together in a room and going through their expectations of the project, and what are the precise measurables of success that they are using.
2 Make a list of the jobs that need to be done. You may not know all the jobs at this early stage, however you should be able to break the project down into sections, and then as time progresses break each section down into finer and finer detail.
3 There must be one leader
You are responsible for the delivery of the project. Don't forget this. You are the person who is the main source of information for this project.
4 Assign people to jobs
Assign REAL people. Make sure there is a name against each activity. Know what their availability and capability is, and assign them accordingly.
5 Manage expectations / allow a margin for error / have afallback position
Contingency is not a nice to have, it's a necessity. Plan different flavours for your project.