4 replies
by mckaytech
You want to do what Microsoft calls a "forklist" migration. Here's how it goes:
(assuming Exchange v5.5)
Set up the new server with NT and install Exchange using setup /r. On completion of this install, do NOT start the services or initialize the directory service.
Shutdown the Exchange services on the old server; a clean shutdown will write the logs to the database.
Restart the services and run NT Backup to truncate the logs and create a safety net.
Shutdown the services and do an off-line backup to tape (or copy the appropriate *.edb files to tape or CD-R).
Restore the tape or files to the new server. Now start the services and test everything thoroughly.
If everything tests okay, backup the new server and put it on-line.
Incidentally, these type of procedures are one of the few times I open an incident with Microsoft before I start. If something does go wrong, it's a tremendous help to have included them from the beginning and the per-incident cost is cheap insurance.
paul
Paul M. Wr
by mdcalvert
This discussion is closed to new replies.
Trending Software posts
Sort by Trending