9 replies
by realgem
Use what you've got. The activities will differ, of course.
There are many ways you could change the plan, but do you really want to implement a product that was not designed or tested on a project that was not formally initiated. Hey, I wouldn't want to manage that.
However, consider phasing the results instead of doing it all big-bang. Deliver the most important features first.
Run a pilot with a controlled set of users. Do performance testing. As well, ensure that you have the architecture set up and do some capacity planning.
by jooehrlein
You might look at what Extreme Programming has to say about project planning. Start at http://www.extremeprogramming.org/.
They recommend a phased approach with a breadth first requirements gathering and then picking an area and working that all the way through detailed requirements, design, development, & test. Then, they pick another area.
This will make the outline for your project plan much messier, but since what you really have is a series of mini-projects, I think it comes out easier to control.
Don't forget that you'll want user-interface prototyping to see if what they say they want is actually what they want (and if it works!).
by pdsmith
I think you have a good start! An outline that we use at my company is as follows:
Initiation
Analysis
Design
Construction
Testing
Implementation
Closure
We then typically have a recurring task, consisting of your everyday project management tasks. The reason we do that is because of the idea of project management continuing over the life-cycle of the project.
by cyndib
Think about your project deliverables. Are you using the "waterfall" type of plan where you start, do various tasks, then deliver the project all at once; or are you using a "spiral" plan, where you divide your product up into many small chucks anddeliver something every 90 days or so. (A lot of internet projects use the spiral technique; a website is made live and each new functionality or linkage is a separate deliverable.)
There are two types of Life cycles with which I am familar. The first is a five phase plan: Requirements, Design, Develop, Test, and Implement. The second is a nine phase plan: Initiate, Requirements, Alternative Evaluation, Design, Detail System Design (Coding), Technical Testing, User Testing, Implementation, and Post Implementation Support/Review. If you use the waterfall technique, usually one phase ends or at least is substantially complete before the next phase begins. In the spiral technique multiple phases are ongoing simultaneously. Good Luck.
This discussion is closed to new replies.