I wonder if there is a rule of thumb on how many applications should be on one server. I have a Dell poweredge 2400, with a RAID controller, 750 mhz PIII, 512RAM, with win 2k server and AD. The single server plays the role of an Exchange 2000 server, ISA server, SQL server, File server, and print server. I think its overloaded 'cause its really SLOW. Does anybody have an opinion?

5 replies

by maxwell edison

I read ZDNet's review of the Dell poweredge 2400, and I noticed a few interesting things.

In the review, it says, "The PowerEdge 2400 can take two Pentium III CPUs clocked at up to 667MHz". You said you had one (I assume) 733 MHz. Using an incompatible processor can indeed be detrimental to performance. Perhaps you should indeed try the two 667s instead on one 733.

You only have 512 MB RAM, but it has the capacity to hold 2GB. With the price of RAM so cheap, perhaps that will bost your performance as well. I would suggest ECC RAM if you do increase it. Crucial.com is a great place to buy RAM, by the way.

The review went on to say, "On the downside, the embedded Raid controller is single-channel only, which puts a limit on disk performance." And it also said, "..any company that needs to support very demanding applications will be looking for more than the dual-processor power of the PowerEdge 2400".

The link to that article is:

http://www.zdnet.co.uk/itweek/reviews/2000/01/enterprise/

(REMOVE SPACES from the pasted URL.)

Perhaps this will give you some ideas.

Best of luck,

Maxwell

by jdickerson

Yes, it is overloaded.....I would run the SQL program on a dedicated box. The rest you might get away with running on a single platform. Depends on how much mail Exchange is processing and how many users are using file/print services