I am testing an application that is to be used for collaboration and training and which has a lot of impact on the LAN and WAN as it has audio features.
Besides testing the features of the product I want to know how to prepare a Test Plan,
conductthe tests, document the findings and then finally prepare the Report.

3 replies

by mckaytech

That's a tough question to fully answer in the space available, but generally your Test Plan should include an inventory of the hardware and software to be used, how you will record your baseline values, what test instruments you will use and what observations you will make. The most critical part of the Test Plan is to identify where the Test will differ from real life and make an assessment of how that will impact the results.

Conducting the tests is simply a matter of obtaining baseline values, running the application and documenting how the network performance differs from the baselines. This can be in a simple "before, during, after" format or can include a wide range of scenarios.

The report will have several sections: the Test Plan, any assumptions made, any qualifiers or conditions, the factual results obtained in tabular form and finally a summary and conclusion.

I know that's a rather skeletal description but I hope it at least provides a start.

paul

by robtechie

Obtaining the baseline values is the most difficult of the lot.
The rest is not difficult.
Thanks for your posting