The following points will be helpful to you while you implement the cabling for your network:
1) Cabling path should be examined properly and check for all the couduits / trunking are properly fixed.
2) Check for any magnatic or heavy electrical field in the path of cables.
3) Cut the cables in the sufficient length and put the temporary markings on the cables at both ends.
4) Do not use oil / soap or any liquid lubricants to pull the cables through the conduits. Use only dry powdered lubricants.
5) Once the cabling is finished terminated the cables according to their temporary markings. This termination to be done under the supervision of a qualified trained personnel.
6) Labeling should be done in the proper way stating cabinet IDs, Port Number, Location etc.
7) Don't forget to check the connectivity of all the cables.
These are the basic things... This can be helpful to the beginners...