1) Strictly size and locate the database server(s). External (Oracle) seems preferable to the bundled, but not very scalable, Solid.
2) Sort out which software is and which isn't available in MSI format. The ways to go in distributing, and the self-healing approaches, vary widely between the two. Define the approaches for both.
3) Define desktop security policy, including what to do with remote control.
4) Decide whether to use imaging or not, and if yes how to handle the maintenance partitions.

Just a few high-level advices, not a total strategy - we used different apps than ZfD for this but I do have extensive lab experiences with ZfD 1/2/3.

Hope this helps,

- The Netherlands

by jimbb

Don't underestimate the time for this. A typical full roll-out takes about 4 weeks, if not longer.
-You need an accurate estimate of the amount of data that will end up in your inventory, and a tree-like roll-up structure for your inventory servers. Which ones, and why.
-A good inventory of your applications is required. Not only names and versions, but who uses them, should fault-tolerance be used etc.
-Interview some key users, like the "dumb" and the "smart" ones, but alse management, IT etc, to see what level of "control" they want or accept from IT. This will help you decide the policies to use.
-Don't forget to have a word with the legal guys and HR, if you plan to use Remote Control.
-Take your time for a lab. Of course totest your solution, but also to check if the look-and-feel is acceptable for the key-customers you defined.

Take your time. We usually do it like this:
1. Study. 5-10 days. NDS health-check, overview of inventory, policies, and possibilities of apps. Discuss what to use and what not.
2. Lab. 5-10 days. Separate tree, make about 5 apps (can be re-used), try out structure for policies (which for all, which per organisation, which per container, how do they fit together). Check look-and-feel.
3. Pilot. 5 days. Install on live servers, re-use apps from Lab, create policies from Lab-documentation, but only for limited set of users (10%).
4. Roll-out. 5 days. Apply apps for everyone, apply policies for everyone.

Document everything you do in steps 1 and 2, both the successes and the failures. Document policies and apps thoroughly. This will ensure a smooth roll-out.

Good luck, and have fun.