Discussion Locked

Outlook Meeting Planner TimeSync Problem

0 helpful
1 reply
Closed to new repliesThis discussion is closed. It stays readable, but it takes no new replies.
Have a strange problem on Outlook (2003): with one of our suppliers, whenever we get a meeting request, the meeting time is 1 hour out on our systems, although correct on theirs. This only happens with this supplier. On their side, they have one other customer with whom this happens, other meeting requests go through with the right time. The systems in question are all set to the same time zone in Microsoft. Has anyone else encountered this issue?

1 reply

by pierrejamme

Check Tools\Options\Calendar Options\Time Zone and make sure it is the correct Time Zone is in the dropdown box and most importantly make sure "Adjust for daylight saving time" box is checked. For some reason it isn't always checked by default and I have even seen it become unchecked for no known reason. And being unchecked will give that user the wrong time by an hour.

This discussion is closed to new replies.