9 replies
by ann777
If they install enough j-hooks (I recommend every 3 feet versus the standard of every 4 to 5 feet), then essentially there won't be cable sag and you need not worry about the pressure on individual cables because their weight is evenly supported on the hooks placed every few feet.
If they attempt to install j-hooks spread more widely apart, then the cables will sag and may develop problems depending on other factors as well. Movement, interferance, etc. will affect cables if they are not supported adequately.
Here are some links:
http://www.trceng.com/networking/attics.htm
http://cr.ucdavis.edu/policies/cabling/cabtwo2.htm
http://www.barbershill.isd.esc4.net/cablingbus.html
http://www.advantagecareertraining.com/set/setinst.htm
Please remove any embedded spaces from the above links, when pasting into your browser.
by rwoodley
by isys
Your building codes should specify either a cable tray or conduit. Check with your city/county building inspectors.
Have you brought this up to your superiors? Will they support your decision.
Your problems won't begin until about a year or so when the combined weight of the cables on top begin to deform the conductors inside the poly jackets.
by rwoodley
by azhan_maj
I think you are right to worry about the proposed installation because that is not the proper installation practice.
With that installation you may find the network or telephone work fine but I'm afraid that the cable performance may be degraded and you may face difficulty in the future. Of course as far as the installation is concerned using J-Hook meet the installation intention but that is not a recommended practice. I believe cable tray or cable ladder would do a lot better that the J-Hooks.
As for the standard practice you may want to refer to TIA/EIA-569 - Commercial Building Standard for Telecommunications Pathways and Spaces
by rwoodley
by cordell
by rwoodley
by rwoodley