Solve this disaster scenario
Take a look at the scenario below and offer your best solution. The most innovative answers will be noted in the Disaster Recovery e-newsletter on March 18, 2003, along with Mike Talon's advice on this particular topic.
You've set up a fully redundant data center at another physical location, staffed with a 24-hour skeleton crew to run the minor operations. This staff is fully trained on how to fail over all your critical Windows 2000 systems so that they can flip the appropriate switches themselves.
Hardware-based replication systems are in place to ensure that every byte of data is committed successfully to both the primary and DR data centers, with no exceptions. You also have servers ready to be connected to that secondary SAN system, and they're pre-configured with all the applications they need.
The primary SAN has approximately two terabytes of active data and another terabyte free, so you’ve placed a 4-TB SAN in the backup data center to ensure that you don’t run out of room. You even have two Active Directory Domain Controllers in the backup site, just in case.
You feel confident that this configuration allows you to promise a failover time of 30 minutes from the point when a disaster is declared.That means you have sufficient time to figure out if it’s really a disaster before you tell the DR crew to jump into action, and then they have a full half-hour to get the systems online.
What's the fatal flaw in this scenario?