<p>The following points will be helpful to you while you implement the cabling for your network:</p>
<p>1)  Cabling path should be examined properly and check for all the couduits / trunking are properly fixed.</p>
<p>2)  Check for any magnatic or heavy electrical field in the path of cables. </p>
<p>3)  Cut the cables in the sufficient length and put the temporary markings on the cables at both ends. </p>
<p>4)  Do not use oil / soap or any liquid lubricants to pull the cables through the conduits.  Use only dry powdered lubricants. </p>
<p>5)  Once the cabling is finished terminated the cables according to their temporary markings.  This termination to be done under the supervision of a qualified trained personnel.</p>
<p> 6)  Labeling should be done in the proper way stating cabinet IDs, Port Number, Location etc.</p>
<p> 7)  Don't forget to check the connectivity of all the cables. </p>
<p>These are the basic things...  This can be helpful to the beginners...</p>